S.No.DocumentsDate
1
Approved list of trainees for the 4th training program on “River Basin Planning using HEC software” at IIT Roorkee, from 20th to 25th Feb, 2017.
Approved list of trainees for the 4th training program on “River Basin Planning using HEC software” at the Department of Hydrology, IIT Roorkee, from 20th to 25th Feb, 2017. Click Here to Download 443KB
Created by: MoWR, RD & GR []
2017.02.17
2
Approved list of trainees for “Application of Surface Geophysical Techniques for Ground Water Prospecting” organised by CGWB under NHP from 20th Feb to 24th Feb, 2017
approved list of Seventeen (17) trainees for the 5 days training programme on “Application of Surface Geophysical Techniques for Ground Water Prospecting” organised by Central Ground Water Board, under the National hydrology Project (NHP) from 20th Feb to 24th Feb, 2017 at the Rajiv Gandhi National Ground Water Training & Research Institute, Raipur, Chhattisgarh. Click Here to Download 882KB
Created by: MoWR, RD & GR []
2017.02.17
3
Domain specific training on Ground Water, being organized by Central Ground Water Board at RGNGWT&RI, Raipur-
Central Ground Water Board is organising 3 domain specific trainings on Ground Water at the Rajiv Gandhi National Ground Water Training & Research Institute, Raipur, Chhattisgarh. Click Here to Download 514KB
Created by: MoWR, RD & GR []
2017.02.08
4
Presentation on STEP
Presentation on systematic tracking of exchange in Procurement Click Here to Download 9MB
Created by: Team World Bank []
2017.01.31
5
User Guide for STEP
Application manual for systematic tracking of exchange in procurements Click Here to Download 3MB
Created by: Team World Bank []
2017.01.31
6
Approved list of trainees for Riverware at Ahmedabad
Approved list of Thirty-Two (32) trainees on Advanced River Basin Planning using "Riverware Software" being held at Ahmedabad from 39th Jan to 3rd Feb, 2017 Click Here to Download 1MB
Created by: NPMU, MoWR, RD & GR []
2017.01.20
7
Installation Package for Riverware Software
The package contains software installation, data and example model Click Here to Download
Created by: Edie []
2017.01.16
8
Instructions for downloading and installing River Ware Software
Instructions for downloading and installing River Ware Software, designed for Riverware training at Ahmedabad Click Here to Download 11KB
Created by: Edie []
2017.01.16
9
Instructions for downloading and installing River Ware Software
Instructions for downloading and installing River Ware Software, designed for Riverware training at Ahmedabad Click Here to Download 11KB
Created by: Edie []
2017.01.16
10
Document for procurement of DWLRs
DWLR for 9 states, 585 number Click Here to Download 4MB
Created by: CGWB []
2017.01.13
11
Postponement the Course on HEC software from 6th 20th – 25th Feb 2017
Postponement of the 4th Course on ‘River Basin Planning using HEC software’ at IIT-Roorkee, scheduled from 6th – 11th Feb, 2017 to 20th – 25th Feb, 2017 under NHP– reg. Click Here to Download 215KB
Created by: NPMU, MoWR, RD & GR []
2017.01.10
12
‘River Basin Planning using HEC software’ from 6th to 11th February, 2017
4th Course on ‘River Basin Planning using HEC software’ from 6th to 11th February, 2017 under NHP at IIT-Roorkee– reg Click Here to Download 468KB
Created by: NPMU, MoWR, RD & GR []
2016.12.30
13
General procurement Notice India National Hydrology Project
General procurement Notice India National Hydrology ProjectbLoad / Credit No (To be Finalised) Click Here to Download 482KB
Created by: []
2016.12.27
14
Bid Document for construction of Data Centre at Mohali, Punjab
Civil Works bid document used by Punjab for construction of Data Center Building at Mohali, Punjab. The construction was done under HP-2 Click Here to Download 3MB
Created by: Punjab []
2016.12.27
15
Standard Bidding Document for Shopping of Goods (E5)
E5 - Standard bidding document for procurement of Goods under shopping method. This document may be used for small procurements and inviting quotations from eligible suppliers. Click Here to Download 50KB
Created by: World Bank []
2016.12.19
16
Example Bid document for hiring man power through HR Agency
Example Bid document for hiring man power through HR Agency. This can be used for many situations like computer operator, data entry operator, account assistant etc. Click Here to Download 453KB
Created by: []
2016.12.15
17
Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science from 19th December 2016 to 27 January 2017.
Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science at National Water Academy in association with World Meteorological Organisation from 19th December 2016 to 27 January 2017. Click Here to Download 83KB
Created by: Datta kumar Chaskar Director & Program Co-coordinator National Water Academy, CWC []
2016.11.30
18
Letter for registration: Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences
Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences,, being organized by the National Water Academy NWA) in association with World Meteorological Organization (WMO) Click Here to Download 483KB
Created by: D S Chaskar, Director - Designs & Program Coordinator National Water Academy (NWA) [2016.11.30]
2016.11.30
19
Reservoir Operations in Bhakra Beas River System
Reservoir Operations in Bhakra Beas River System Click Here to Download 12MB
Created by: Anil Byas, BBMB []
2016.11.17
20
INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS
INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS - TAMIL NADU Click Here to Download 13MB
Created by: Public Works Department, Water Resources Department. []
2016.11.17
21
SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA
SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA Click Here to Download 20MB
Created by: Water Resources Department, Govt of Karnataka []
2016.11.17
22
Presentation on Automation of Dams/Barrages in U.P. with the help of SCADA System
Automation of Dams/Barrages in U.P. with the help of SCADA System Click Here to Download 15MB
Created by: Mr. Navin Kapoor, Superintending Engineer []
2016.11.17
23
India Waris - Web GIS
Generation of Database and Implementation of Web Enabled Water Resources Information System in the Country Click Here to Download 31MB
Created by: Yogesh Pathainkar, CWC []
2016.11.17
24
Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha
Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha Click Here to Download 3MB
Created by: Dr. Ritesh Kumar, Wetlands International South Asia & Dr. AjitPattnaik, Chilika Development Authority []
2016.11.17
25
WR2012 system - Water information management system for South Africa, Lesotho and Swaziland.
WR2012 system - Water information management system for South Africa, Lesotho and Swaziland. Credits: South Africa National Department of Water & Sanitation, SA Water Research Commission, Bill Pitman, Allan Bailey, Marieke de Groen Click Here to Download 3MB
Created by: Ian Rushton, Royal Haskoning DHV, Netherlands []
2016.11.17
26
Integrated water data management and irrigation water needs - case study of HAIS Guadiana River
Integrated water data management and irrigation water needs - case study of HAIS Guadiana River Click Here to Download
Created by: Luis Martin EPTISA Spain []
2016.11.17
27
Building knowledge and technology through collaborative water monitoring
Building knowledge and technology through collaborative water monitoring Click Here to Download 8MB
Created by: Paul Wilson, Government of Victoria , Australia []
2016.11.17
28
Promoting IWRM at national, international and cross-national level
Promoting Integrated Water Resources Management at national, international and cross-national level - UNDP - DHI Partnership (Center on Water and Environment) Click Here to Download 10MB
Created by: Hans Chr. Ammentorp, Denmark []
2016.11.17
29
NHI: the Netherlands Hydrological Instrument
NHI: the Netherlands Hydrological Instrument Click Here to Download 29MB
Created by: Kee Bons, Deltares, Netherlands []
2016.11.17
30
Australia Water Partners for development helping to manage water scarcity in the indo pacific
Understanding the water resources base, River Basin planning & water allocation framework, governance reforms & institutional straightening, managing demand & improving efficiency Click Here to Download 5MB
Created by: Alluvium Consulting and AWP Partner []
2016.11.17
31
PRESENTATION on reliable data acquisition system
PRESENTATION on reliable data acquisition system Click Here to Download 18MB
Created by: PAN INDIA CONSULTANTS PVT. LTD. []
2016.11.17
32
Komoline Aerospace Limited INDIA
Hydrology Measurement Solutions with Smart Sensing Click Here to Download 13MB
Created by: Team Komoline []
2016.11.17
33
DHIs Data and Sensor strategy Data Acquisition, Management, Decision Support and Operations
DHI Data and Sensor strategy Data Acquisition, Management, Decision Support and Operations Click Here to Download 1MB
Created by: Dr. Ole Larsen, DHI []
2016.11.17
34
DHI The expert in WATER ENVIRONMENTS
DHI Softwares - The expert in WATER ENVIRONMENTS Click Here to Download 4MB
Created by: Sajid Alam-Manager MIKE Powered by DHI []
2016.11.17
35
Sutron Corporation
Designing answers that go beyond the expectations of Hydromet professionals to support them in caring for the world’s water Click Here to Download 15MB
Created by: Team Sutron []
2016.11.17
36
ALM Systems - Smart Instrumentation for the water industry
Automation and Maintenance Management Systems SMART INSTRUMENTATION FOR THE WATER INDUSTRY Click Here to Download 2MB
Created by: Hugo Schmalz & Prakash Muthuswamy []
2016.11.17
37
Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES
Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES Click Here to Download 4MB
Created by: ARUSHI BHALLA & MANISH MEHTA []
2016.11.17
38
SWAN ENVIRONMENTAL
SWAN ENVIRONMENTAL Private Limited Click Here to Download 7MB
Created by: SWAN ENVIRONMENTAL []
2016.11.16
39
SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry
SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry Click Here to Download 14MB
Created by: Jens Petry []
2016.11.16
40
ALS Hydrographics at a Glance
Reliable Data Acquisition System for Integrated Water Resource Management Click Here to Download 6MB
Created by: ALS Hydrographics []
2016.11.16
41
KISTERS at a glance
International Seminar on the National Hydrology Project Click Here to Download 9MB
Created by: William Steen []
2016.11.16
42
Rubicon Water Measurement, Monitoring, Control & Mgt. solutions
Rubicon Water Measurement, Monitoring, Control & Mgt. solutions Click Here to Download 8MB
Created by: Dr. Ajay Pradhan (Adviser) []
2016.11.16
43
Xylem Analytics Environmental Monitoring Systems & Solution
Xylem Analytics Environmental Monitoring Systems & Solution Click Here to Download 33MB
Created by: Xylem Water Solutions India Pvt. Ltd. []
2016.11.16
44
Smart Digital Integrated Water Resource Management & Control System
Smart Digital Integrated Water Resource Management & Control System Click Here to Download 5MB
Created by: Mechatronics System Private Limited []
2016.11.16
45
Water Quality Acquisition System in Australia
Water Quality Acquisition Systems in Australia Click Here to Download 9MB
Created by: Chris O Neill - Hydronumerics and AWPPartner []
2016.11.16
46
Ground Water Monitoring and Data Management System in Denmark
Ground Water Monitoring and Data Management System in Denmark Click Here to Download 4MB
Created by: Ole Larsen, Danish Ground Water Forum []
2016.11.16
47
Ground Water Monitoring System in Andhra Pradesh
Real Time Groundwater and other Water Resources Monitoring for Real Time Governance Click Here to Download 8MB
Created by: Dr. Venugopal Rao Andhra Pradesh GWD []
2016.11.16
48
Hydro-Meteorological Data Acquisition System in Australia
Hydro-Meteorological data Click Here to Download 5MB
Created by: Paul Sheahan, Bureau of Meteorology, Australia and AWP Partner []
2016.11.16
49
Hydro-Meteorological Network Assessment and Improvement
Best practices for hydro meteorological network design, revision and improvement of existing infrastructures Click Here to Download 3MB
Created by: Levis Franky EPTISA Spain []
2016.11.16
50
National Hydrology Project
Overview and Readiness - National Hydrology Project Click Here to Download 7MB
Created by: Niraj Manglik & Avanish Kant, Ministry of Water resources, River Development and Ganga Rejuvenation []
2016.11.16
51
Theme Introductory Presentation - Hydrological Data
Global Water Needs Click Here to Download 50MB
Created by: Dr. Nagaraja Rao Harshadeep, Lead Environment Specialist, The World Bank []
2016.11.16
52
Letter for the approved list of trainees for the training program on River Basin Planning using waterware software
Letter (No: X-94012/4/2016-NHP/2411-2414) for the approved list of trainees for the training program on River Basin Planning using waterware software from 14th to 18th November 2014, at Kolkata being organised by DVC Click Here to Download 1MB
Created by: Team NPMU []
2016.11.11
53
Letter for training on River Basin Planning using Water-ware Software at Kolkata under National Hydrology Project
Letter (No.: X-94012/4/2016-NHP) for training on River Basin Planning using Water-ware Software from 14th to 18th November, 2016 at Kolkata under National Hydrology Project Click Here to Download 85KB
Created by: MOWR []
2016.11.07
54
Notification for Waterware training at Kolkata 14-18 Nov
Notification and invitation for nomination for waterware training at Kolkata 14-18 Nov Click Here to Download 213KB
Created by: MoWR []
2016.11.02
55
Filled template for assessment of e-Procurement by Team CWC
Assessment of Compliance of the e-GP System with the MDB e-GP requirements for MDB Loans, Grants and Credits Click Here to Download 136KB
Created by: Team CWC [2016.10.17]
2016.10.17
56
Standard Bid Document for procurement of goods under NCB
Standard Bid Document for procurement of goods under National Competitive Bidding (NCB) (Document E1, Revised Feb 2015 ) Click Here to Download 204KB
Created by: The World Bank []
2016.10.17
57
Do Letter regarding signing of memorandum of agreement inclusive program Agenda for 14th October 2016
DO Letter (D.O.No. G72018/1/2016/NHP/2104/41) by ministry of water resources to all the implementing agencies regarding signing of memorandum of agreement with detailed agenda. Click Here to Download 2MB
Created by: Team MOWR [2016.10.06]
2016.10.06
58
Invitation for International Seminar at Pune
Invitation for International Seminar on Reliable Data Acquisition System for Integrated Water Resources Management 7-8 November, 2016 Hotel Hyatt Regency Weikfield IT Part, Pune organised by Central Water and Power Research Station, Pune. Indian Society for Hydraulics, CWPRS, Pune Click Here to Download 13KB
Created by: Team CWPRS [2016.10.07]
2016.10.05
59
The Aide Memoire - National Hydrology Project, Appraisal Mission , August 1-5 , 2016
A World Bank project appraisal mission was conducted from August 1 to 5, 2016 for the National Hydrology Project (NHP). The mission objectives were to appraise the project and assess the readiness of project for negotiation. The Aide Memoire summarizes mission findings and the status of project preparation Click Here to Download 540KB
Created by: The World Bank []
2016.10.04
60
Management Letter regarding Project Appraisal Mission (August 1-5 , 2016), Summarizing the missions finding and status of the project Preparations
Aide Memoire Summarizing the missions finding and status of the project Preparations regarding detailed discussions with central and state agencies grouped according to major river basins in Delhi and the wrap-up meeting was concluded under the chairmanship of Dr. Amarjit Singh, Officer on Special Duty, MoWR, RD&GR Click Here to Download 270KB
Created by: The World Bank []
2016.10.04
61
invitation for proposals (IFP) for empanelment of equipment supplier
invitation for proposals (IFP) for empanelment of equipment supplier under Empanelment agreement Click Here to Download 1MB
Created by: Team CWC [2016.09.28]
2016.09.28
62
Project Brochure for National Hydrology Project, September 2016
Brochure - National Hydrology Project. Project objective is to extend , quality and accessibility of water resources information and to strengthen the capacity of targeted water resources management institutions in India Click Here to Download 302KB
Created by: Team World Bank []
2016.09.27
63
Workshop brochure for International Seminar on Reliable Data Acquisition System for integrated Water Resources System
Brochure - International Seminar on Reliable Data Acquisition System for integrated Water Resources System on the occasion of CWPRS Centenary Year 2016. from 7th to 8th November 2016, Hotel Hyatt Regency, Pune. Click Here to Download 670KB
Created by: Team CWPRS [2016.09.27]
2016.09.27
64
Approved Memorandum of Agreement and Financial Management Guidelines under National Hydrology Project
Memorandum of Agreement (MoA) under National Hydrology Project between Ministry of Water Resources, River Development & Ganga Rejuvenation and Project Implementing Agencies Click Here to Download 163KB
Created by: Team NHP [2016.09.19]
2016.09.17
65
Government Letter (X- 94012/4/2016-NHP/1824) Training Program on Procurement Procedures
Government Letter regarding two days training program on World Bank Procurement Procedures from 29th to 30th September 2016 at Shillong Meghalaya under National Hydrology Project Click Here to Download 400KB
Created by: Team MOWR - NHP []
2016.09.14
66
Letter (No X-94012/4/2016-NHP/4297)for Training on River Basin Planning using River ware software
Letter for Training on River Basin Planning using Riverware Software from 30 January to 3 February 2017 at Ahmedabad under NHP- reg. Click Here to Download 691KB
Created by: Team MOWR [2016.12.21]
2016.09.08
67
Government Letter ( No. NHP/T-/2016-NIH/1003 ) regarding Surface water modelling at NIH, Belgaum under NHP
Government Letter to all the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of a 5-Day Training Workshop on “Surface water modelling" during Oct. 17-21, 2016 at RC, NIH, Belgaum under NHP. Click Here to Download 219KB
Created by: Team NIH [2016.09.17]
2016.09.02
68
Government Letter (No. NHP/T-/2016-NIH/1002 ) Regarding training on Basic Hydrology at CFMS, NIH, Guwahati
Government Letter to All the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of a 5-Day Training Workshop on “Basic Hydrology" during September 26-30, 2016 at CFMS, NIH, Guwahati. Click Here to Download 218KB
Created by: Team NIH []
2016.09.02
69
Government Letter (No. NHP/T-/2016-NIH/1001), regarding Ground Water and Transport Modelling at RC, NIH, Kakinada
Government Letter to All the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of 5-Day Training Workshop on “Ground Water and Transport Modelling" during Sept. 26-30, 2016 at RC, NIH, Kakinada under NHP. Click Here to Download 221KB
Created by: Team NIH [2016.09.17]
2016.09.02
70
A small write-up on Cloud server and its comparison with physical server
This document explains various parameters about cloud server, the comparison of cloud server vs physical server, the cost of cloud services and description about backup features provided by cloud server. Click Here to Download 15KB
Created by: World bank []
2016.09.01
71
HIS manual for Hydromet Systems
Hydromet manual contains chapters on network design density, site selection, instrument selection, specification, installation guidelines, telemetry etc. The content covers Surface water instruments (like water level, rain gauges, automatic weather station) Ground water and water Quality aspects. Click Here to Download 6MB
Created by: World bank []
2016.09.01
72
Comparison of VSAt and INSAT Radio based satellite telemetry
The selection of INSAT radio vs VSAT based satellite telemetry depends on many factors like location, availability of space, requirement of one way or two way communication etc. A comparison of two telemetry methods based on these parameters is provided in the document Click Here to Download 29KB
Created by: World Bank []
2016.08.31
73
Sample Implementation Arrangement Document from State of West Bengal & Telangana
Sample State Project Management Unit Implementation Arrangement Document from State of West Bengal & Telangana Click Here to Download 1MB
Created by: Team NHP []
2016.08.28
74
Basin-state matrix for major activities under project
This document list the sub-basins falling under each states. The columns are provided for major project activities like flood forecasting, river basin planning, hydromet etc. The agencies should fill the current status of these activities in state, and proposed activities in the project Click Here to Download 64KB
Created by: Team NHP []
2016.08.22
75
Template for bench-marking of Water Data Centers and the Water Institution
This document lists the questions required for bench-marking water data centers and the institution as whole. There would be a marking system, which will help in evaluation current baseline and project end targets for institutional capacity. Agencies should provide feedback on the template, to make sure that major elements of the bench-marking are covered. Click Here to Download 84KB
Created by: Team NHP [2016.12.22]
2016.08.22
76
Threshold for procurement method and prior review
This document define the threshold applicable for NHP regarding different procurement types like Goods, Works, Consultancy and Different Procurement methods like ICB, NCB Shopping. The threshold for prior and post review are also defined Click Here to Download 21KB
Created by: Team World Bank []
2016.08.21
77
Official Letter for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee
Official Letter (Letter no: G-72012/1/2016-NHP/1619-1621) for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee Click Here to Download 430KB
Created by: Mr. Avanish Kant [2016.08.19]
2016.08.19
78
Standard Procurement Document , Standard request for proposals (Trial version of electronic procurement ) Selection of Consultants V1.0 July 2012
This trial version of Standard Request for Proposals for the use in electronic procurement (SRFP) has been prepared by the World Bank on the basis of the World Bank Standard Request for Proposals dated October 2012. This SRFP can be used with different selection methods described in the Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, dated January 2011 (Consultants Guidelines), including Quality- and Cost-Based Selection (QCBS), Quality-Based Selection (QBS), Selection under a Fixed Budget (FBS), and Least-Cost Selection (LCS). When mandating the use of this SRFP on the implementing agency, however, primary consideration should be given to the complexity and value of the assignment Click Here to Download 453KB
Created by: Team World Bank []
2016.08.17
79
Telangana Ground Water Proposed Organogram – NHP
Telangana Ground Water Proposed Organogram – National Hydrology Project Click Here to Download 54KB
Created by: Team Telangana GW []
2016.08.09
80
Draft framework for monitoring and evaluation indicators
The list of project indicators, by component, is provided in this document. The agencies should go through the indicators, provide feedback and set baseline (situation as on today) and project end target against each indicator. Click Here to Download 21KB
Created by: Team NHP []
2016.08.02
81
A questionnaire for Hydromet Design for reservoirs while preparing bid document
A questionnaire has been prepared to guide implementing agencies in deciding the right technology (Telemetry, water level sensor) for integrated reservoir monitoring. The questionnaire will guide the agency while preparing bid documents for Hydromet of Reservoir / Barrage monitoring. Click Here to Download 15KB
Created by: World Bank [2016.09.01]
2016.07.22
82
World Bank Mission Under National Hydrology Project from 1st to 5th August, 2016
The Ministry of Water Resources , River development and Ganga Rejuvenation (MOWR, RD & GR) is coordinating the implementation of the National hydrology projects as a central sector scheme with world bank assistance. The world bank mission id to review the readiness of NHP in respect of all the implementing agencies. Click Here to Download 2MB
Created by: MOWR [2016.07.18]
2016.07.18
83
Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP
Invitation of online Expression of Interest for engaging Consulting Services for the Technical Assistance and Management Consultancy under National Hydrology Project. Click Here to Download 904KB
Created by: Ministry of Water Resources [2016.10.05]
2016.05.18
84
Preparation of a Work-Plan for Year 1 and Year 2
Work Plan is an outline of phasing project activities to be carried out in a financial year including its physical and financial aspects Click Here to Download 87KB
Created by: Team NHP []
2016.05.10
85
Preparation of a Procurement Plan for the first 18 months
Procurement Plan detailing out procurement activities envisaged to be carried out during a financial year including its financial aspects Click Here to Download 124KB
Created by: Team NHP []
2016.05.10
86
The detailed Project Cost Estimate Table
Component, activity and sub activity wise cost estimate table Click Here to Download 349KB
Created by: Team NHP []
2016.05.10
87
 The Detailed Project Implementation Plan (PIP) Report Project (NHP) - central as well as states
 The Detailed Project Implementation Plan (PIP) Report is a pre-requisite document that needs to be prepared by all the implementing agencies of the National Hydrology Project (NHP) - central as well as states Click Here to Download 132KB
Created by: Team NHP []
2016.05.10
88
NHP Implementation strategy
The presentation on NHP Implementation strategy covers, Implementation arrangement (NPMU/ TAMC/SPMU), Fund Flow and Audit Mechanism, Project Monitoring Mechanism (Physical & Financial Monitoring) and Status of PIP Click Here to Download 1MB
Created by: Avanish Kant [2016.05.10]
2016.05.10
89
Overview of Financial Management under NHP
The presentation provides overall overview on financial management which covers, Budgeting, fund flow, accounting, staffing , IUFR, external and internal audit Click Here to Download 697KB
Created by: Krishna [2016.05.10]
2016.05.10
90
Monitoring and Evaluation (M&E) Framework for NHP Open-house Discussions
The Presentation define about M & E framework to Help managers at all levels track results, implementation progress and agency performance and so make improvements and corrections. Show achievements and emerging issues to managers, decision makers and supervisors. Demonstrate the value of the project to politicians and the general public Click Here to Download 84KB
Created by: Chris Wald [2016.05.10]
2016.05.10
91
Framework agreement
The presentation highlights the core areas of equipment framework, how it will work and about the benefits after integration to bid document Click Here to Download 369KB
Created by: Dr. Anish Bansal [2016.05.10]
2016.05.10
92
Strategy for integrating IndiaWRIS and StateWRIS including data sharing mechanism
The objective of the presentation, To collect available data from varied sources, generate new database, organize in standardized GIS format and provide scalable web-enabled information system. To provide easier and faster access for sharing of nationally consistent water resources data through a centralized database server. To provide tools to create value added maps by way of multi-layer stacking so as to provide integrated view to the water resources. To provide foundation for advanced modeling and future Spatial Decision Support Systems (SDSS) & automated data collection system. Click Here to Download 9MB
Created by: Yogesh Paithankar [2015.12.08]
2016.05.09
93
Flood forecasting and Water Resources Modelling approach under NHP (Macro & Micro River Basin Modelling)
Discussion on flood forecasting, consultancy by central water commission, macro & micro level modeling contribution by state. Click Here to Download 489KB
Created by: CPMU, Manglik [2015.12.09]
2016.05.09
94
Project implementation strategy
The presentation about project cabinet approval, project implementation strategy and financial management. Click Here to Download 1MB
Created by: Dr. Amita Prasad, JS and Coordinator –NHP, MoWR [2015.12.02]
2016.05.09
95
Current Status of Project and Way Forward,
The presentation about Project Components, Preparation of Bid-documents,Project Timeline and current status of the project and way forward Click Here to Download 8MB
Created by: Dr. Anju Gaur [2015.05.21]
2016.05.09
96
Example Bid Document for Surface Water
Example Bid Document for Surface Water Click Here to Download 1MB
Created by: The World Bank [2016.02.10]
2016.02.10
97
Example Bid Document for Ground Water - DWLR
Example Bid Document for Ground Water - DWLR shared by Uttar Pradesh Click Here to Download 316KB
Created by: [2016.04.21]
2016.02.10
98
Bidding Document for Procurement of Digital Water Level Recorders (DWLR) With Telemetry
Example bid document for procurement of DWLR, an example from UP Click Here to Download 316KB
Created by: Team NHP [2016.10.05]
2016.02.02
99
Visit to The Netherlands: Key Learnings under National Hydrology Project
The delegations, Purpose of the visit, water resources data and crises management center, flood modeling nodes, waste water treatment etc. Click Here to Download 10MB
Created by: [2015.12.02]
2015.12.02
100
Acceptance Checklist
Hydromet monitoring stations Acceptance Checklist, water level and discharge monitoring stations. Click Here to Download 31KB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.18]
2015.11.16
101
Module - Technical Specifications for RTDAS
The module cover procurement of civil works, consultancy services, non consultancy services, goods (hydrological information system). Tender document for RTDAS Click Here to Download 1MB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.16]
2015.11.15
102
Bank Procurement Guidelines
General consideration, applicability of guidelines, conflict of interest, eligibility to offer goods and works, advance contracting and retroactive financing Click Here to Download 103KB
Created by: [2015.11.04]
2015.11.14
103
Technical Specifications
This module covers goods, services, warranty with operation and maintenance with technical specifications, maps & drawings and GIS locations of installations Click Here to Download 1012KB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.16]
2015.11.14
104
Hydrological Information System - Water Level measurements
This module covers surface level water measurements in rivers/canals/reservoirs, water sensors, contract and non contract solutsions Click Here to Download 10MB
Created by: [2015.11.16]
2015.11.14
105
Example Hydromet Bid Document Version Part 2
Hydromet bid example with reference to Supply, installation, testing, commissioning, training and maintenance of Automatic Barrage Operation of Durgapur Barrage, Click Here to Download 1MB
Created by: Office of the Superintending Engineer [2016.08.17]
2015.11.14
106
Site Selection Guidelines
This module covers hydrological monitoring stations, the purpose of the site, appropriateness for monitoring the parameter of interest, existing infrastructure, access, and security should be considered. Click Here to Download 1MB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.16]
2015.11.14
107
Example Bid Document from state of Tamilnadu
This module covers standard bid document example form state of tamilnadu specifications, training components etc. Click Here to Download 896KB
Created by: Dr Anish Kumar, The world Bank [2016.08.17]
2015.11.14
108
PROCUREMENT- Civil Works
Procurement thresholds, type of bidding document for works, features of bank modal, general requirements, bid security, price requirements etc. Click Here to Download 956KB
Created by: Mr. Vedumurthy, World Bank [2015.11.16]
2015.11.14
109
Training Module for BIDDING DOCUMENTS - Procurement of Goods
Objective, Procurement of goods, NCB, NCD Conditions, direct contracting, framework agreement, community based procurement, common issues in goods, ICB Click Here to Download 586KB
Created by: Team NHP [2016.11.03]
2015.11.14
110
Preparation of Procurement Plan (PP)
Need for procurement plan, Guidelines, Templates, format, Procurement cycle and categories. Click Here to Download 220KB
Created by: Mr. Vedumurthy, World Bank [2015.10.31]
2015.11.14
111
Hydrological Information System - Integrated Reservoir Monitoring System
This module covers about integrated reservoir water monitoring system, option for reservoirs, reservoir monitoring examples, criteria for selection and site example photographs Click Here to Download 2MB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.16]
2015.11.14
112
Hydrological Information System - Telemetry Systems
The module covers communication options, earth receiving stations, transmitter specifications, ERC specifications. Telemetry includes data logger to control room, INSAT VSAT GSm GPRS etc. Click Here to Download 4MB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.10.28]
2015.11.14
113
Hydrological Information System - Discharge Measurement
The module covers acoustic Doppler systems, ADVM general information, upward looking ADVM, Side looking ADVM, ADCP (current Profiler), discharge measurements, site selection, site problems etc. Click Here to Download 40MB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.03]
2015.11.14
114
World Bank Procurement Procedures
The module covers about bank Procurement, bank role in procurement, borrowers role, word bank procedure policies, legal documents governing bank operational procurement Click Here to Download 3MB
Created by: Mr. Vedumurthy, World Bank [2015.11.16]
2015.11.14
115
Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations
Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations Click Here to Download 684KB
Created by: [2015.11.08]
2015.11.06
116
River Basin Management in Southern Africa
SADC Institutional Arrangements, Orasecom Plan and Lessons Learned, Southern African basins Click Here to Download 3MB
Created by: [2015.11.06]
2015.11.06
117
Global Water Challenges - A River Basin Managers Perspective
Update on Australian Water Reform,Observations on Current River Basin Challenges, Surface and Groundwater Irrigation—where is it going??? and Australian Water Partnership Click Here to Download 9MB
Created by: Don Blackmore AM FTSE, (Chairman eWater –Chairman IWMI and former CE MDBC) [2015.11.06]
2015.11.06
118
Agenda for the Training
Background, objective, dates, venue, resource persons, target group and contact details Click Here to Download 219KB
Created by: Admin - IndiaWRM [2015.11.07]
2015.11.02
119
Summary Report on India National Groundwater Meeting: Scoping a National Reform Agenda
Groundwater Governance and Management in India, Groundwater Reforms in Australia and NSW: An Overview, Hidden Treasure: Groundwater in India Click Here to Download 530KB
Created by: [2015.11.02]
2015.11.01
120
National Hydrology Presentation for TAMC workshop 29th October 2015
Created by: [2015.10.29]
2015.10.29
121
List of Perticipants
Total 51 number of participants has attended the workshop Click Here to Download 158KB
Created by: Admin - IndiaWRM [2015.09.24]
2015.09.24
122
Summary – Key messages
Summary – Key messages, key reform elements and next steps Click Here to Download 51KB
Created by: [2015.09.24]
2015.09.23
123
Space technology in MoWR
India - WRIS, data information, management and dissemination. Setting up National Water Informative Center Click Here to Download 2MB
Created by: [2015.09.24]
2015.09.23
124
hidden treasure - Ground Water in India
India is the world largest user of ground water for agriculture, but within India context differ. Transformation impact, India borewell revolution. Click Here to Download 4MB
Created by: [2015.09.24]
2015.09.23
125
Groundwater Reforms in Australia
Groundwater Reforms in Australia and New South Wales New Delhi – September 2015 Click Here to Download 3MB
Created by: [2015.09.24]
2015.09.23
126
Current Groundwater Governance & Management in India
Ground water scenario, challenges, current governance system, management initiatives and suggested Ground Water government reforms Click Here to Download 16MB
Created by: [2015.09.24]
2015.09.23
127
Agenda for India Groundwater Meeting: Scoping a National Reform Agenda
Agenda for India Groundwater Meeting: Scoping a National Reform Agenda Ministry of Water Resources, River Development and Ganga Rejuvenation Click Here to Download 404KB
Created by: Admin - IndiaWRM [2016.08.17]
2015.09.18
128
WB Mission Wrap up meeting CWPRS PIP- brief
National Hydrology Project (HP Phase 3) WB Mission 1-15, Sept., 2015 Project Implementation Plan (PIP) Revision Technical Session: Role and Responsibilities of Central Agencies , Central Water & Power Research Station Click Here to Download 4MB
Created by: CWPRS [2015.09.15]
2015.09.15
129
Institutions for River Basin Management in Australia
Bill Young Lead Water Resources Management Specialist World Bank, New Delhi Click Here to Download 2MB
Created by: [2015.09.15]
2015.09.15
130
NHP -Mission 15th September 2015
Concepts of Hydrology Project, NHP Project Details, Fund Allocation Component Wise Click Here to Download 22MB
Created by: [2015.09.15]
2015.09.15
131
National Hydrology Project The Way Forward
NHP - Learning from HP1 & HP2, Expected benefits & outcomes, Present status, Concerns of States, Silent features Click Here to Download 895KB
Created by: Avanish Kant, CPMU [2015.09.15]
2015.09.15
132
Presentation-Innovation in Lead Flood Forecast
Created by: [2015.09.14]
2015.09.14
133
IWRM in River Basin
Water Resources Management – Challenges … and the use of models Click Here to Download 3MB
Created by: [2015.09.14]
2015.09.13
134
National Hydrology Project – Where we stand
NHP - Project background, Need for the Project, Expected benefits and outcomes Click Here to Download 905KB
Created by: [2015.09.14]
2015.09.13
135
NHP Structure
Created by: [2015.09.14]
2015.09.13
136
Role of MOWR in NHP
Achievements of HP1 and HP2. Role of MOWR in NHP, Expectations from States Click Here to Download 3MB
Created by: [2015.09.14]
2015.09.13
137
Role of CWC in NHP
Activities Proposed to be carried out by CWC. Flash flood guidance coupled with weather forecast, Inundation modeling including cyclone related floods in delta regions Click Here to Download 1MB
Created by: [2015.09.14]
2015.09.13
138
Role of CGWB in NHP
e-Gems outlines, roles and responsibilities, ground water issues for consideration in NHP, Project objectives, Project success indicators, Proposed financial outlay, CGWB support to the states Click Here to Download 467KB
Created by: [2015.09.14]
2015.09.13
139
Role of NIH in NHP
Activities carried out during hydrology project phase 1 and 2. Project implementation plan of NIH, Proposed activities under NHP. Training and PDS. TOR for training, expert group. Click Here to Download 563KB
Created by: [2015.09.14]
2015.09.13
140
Role of NRSC in NHP
NRSC commitment to NHP, NRSC components, proposed activities under National Hydrology Project, development of country wide and web based hydro logical modelling system. Click Here to Download 10MB
Created by: [2015.09.14]
2015.09.13
141
World Bank Mission Under National Hydrology Project from 1st to 15th September, 2015
The Ministry of Water Resources , River development and Ganga Rejuvenation (MOWR, RD & GR) is coordinating the implementation of the hydrology projects with world bank assistance. The world bank mission is to finalize the project implementations plan, in respect of all the implementing agencies. Click Here to Download 3MB
Created by: [2015.08.26]
2015.08.26
142
Consultancy Service
Created by: [2015.07.31]
2015.07.30
143
Presentation on Request for proposals - Selection of Consultants
Presentation on request for proposals for Selection of Consultants Click Here to Download 797KB
Created by: Mr. Arun [2016.11.03]
2015.07.29
144
Civil Works
Created by: [2015.07.31]
2015.07.28
145
Bid Evaluation -Procurement of Goods or Work
Created by: [2015.07.31]
2015.07.28
146
Procurements under World Bank Funded Projects
Created by: [2015.07.27]
2015.07.27
147
The World Bank Group, Governance Global Practice, Public Integrity and Openness Procurement Workshop
Created by: [2015.07.27]
2015.07.27
148
PROCUREMENT GUIDELINES IMPORTANT ASPECTS
Introduction, International competitive bidding, other methods of procurement, review by the bank, guidance to the bidders. Click Here to Download 334KB
Created by: [2015.07.27]
2015.07.27
149
PROCUREMENT NCB - CIVIL WORKS
General requirements, National competitive bidding, instructions to the bidders, bid security, price adjustments etc. Click Here to Download 470KB
Created by: [2015.07.31]
2015.07.27
150
General features of Public Procurement
Basin Principles of Public Procurement Click Here to Download 338KB
Created by: Arun Kumar Kolsur [2016.09.14]
2015.07.27
151
Procurement under World Bank funded Projects
Created by: [2015.07.27]
2015.07.26
152
National Hydrology Project
About National Hydrology Project and its components Click Here to Download 2MB
Created by: Dr. D.S. Chaskar, Director NWA [2015.07.27]
2015.07.24
153
Network Design
Created by: [2015.06.24]
2015.06.24
154
ARG and Automatic Weather Stations
Created by: [2015.06.24]
2015.06.24
155
Telemetry
Created by: [2015.06.24]
2015.06.24
156
Integrated Reservoir Monitoring
Created by: [2015.06.24]
2015.06.24
157
SCADA Systems
Created by: [2015.06.24]
2015.06.24
158
Water Level Monitoring
Created by: [2015.06.24]
2015.06.24
159
Discharge Measurement
Created by: [2015.06.24]
2015.06.24
160
India WRIS
Created by: [2015.06.24]
2015.06.24
161
Database Management – eSWIS
Created by: [2015.06.24]
2015.06.24
162
Agenda for the Training
Background, objective, dates, venue , resource persons, target group and contact details Click Here to Download 440KB
Created by: Admin - IndiaWRM [2015.06.22]
2015.06.19
163
Government Letter for Training on hydro-met network design under National Hydrology Project
Government Letter for Training on hydro-met network design under National Hydrology Project at Himachal Pradesh institute of Public Administration (HIPA) Click Here to Download 548KB
Created by: Avanish Kant [2016.08.17]
2015.06.04
164
Module 11 - Essential Elements of a HIS
Essential elements of hydrological information systems Module 15 Click Here to Download 5MB
Created by: [2015.04.06]
2015.04.06
165
Module 12 - Overview of Hydrologic Monitoring
Overview of hydrological monitoring Click Here to Download 4MB
Created by: [2015.04.06]
2015.04.06
166
Module 13 - Data Management Systems
Development of hydrometeorological system , data management system for improved water management Click Here to Download 166KB
Created by: [2015.04.06]
2015.04.06
167
Module 14 - AWS and ARG
Hydrological information system module automatic weather station and automatic rain guage Click Here to Download 4MB
Created by: [2015.04.06]
2015.04.06
168
Module 15 - Surface-Water Instrumentation
Surface Water instrumentation Click Here to Download 48MB
Created by: [2015.04.06]
2015.04.06
169
Module 15 A - Intro to ADCPs
Indroduction to accoustic doppler current profiler Click Here to Download 27MB
Created by: [2015.04.06]
2015.04.06
170
Module 20 - Integrated Reservoir Monitoring
Hydrological information system module Integrated Reservoir monitoring system Click Here to Download 2MB
Created by: [2015.04.06]
2015.04.06
171
Module 17 - Water Quality Monitoring
Overview of continuous water quality monitoring Click Here to Download 3MB
Created by: [2015.04.06]
2015.04.06
172
Module 18 -Telemetry
Hydrological information system module telemetry systems Click Here to Download 2MB
Created by: [2015.04.06]
2015.04.06
173
Module - 2 WARIS_Presentation for Kolkata
Generation of database and implementation of Web enabled water resources information system in the country Click Here to Download 35MB
Created by: [2015.04.06]
2015.04.06
174
Module 3 -Meteorological data collection network of IMD
Meteorological data collection network of IMD Click Here to Download 8MB
Created by: [2015.04.06]
2015.04.06
175
Module - 5 Presentation on online surface water system (ISWis)
Presentation on ISWIS - broad features based on web and desktop applications, data & functionality will be integrated, etc. Click Here to Download 31MB
Created by: [2015.04.06]
2015.04.06
176
Module 6 - Met Network Design
Design of meteorological data networks, Hydro-Met Network Design Workshop, April 6-11, 2015 Kolkata Click Here to Download 2MB
Created by: [2015.04.06]
2015.04.06
177
Module 7 - Design of Key Rain gauge Network
Raingauge network design, categories, methods, stages etc. Click Here to Download 1MB
Created by: [2015.04.06]
2015.04.06
178
Module 9 - Design of hydro-met station network
Hydrometeorological network model of central water commission Click Here to Download 2MB
Created by: [2015.04.06]
2015.04.06
179
Module 10 - Continuous QW Data
Continuous water quality monitoring Click Here to Download 826KB
Created by: [2015.04.06]
2015.04.06
180
Module 16 - Site Selection, Datum, and Example Stattions
Site Selection, Datum, and Example Stattions Click Here to Download 69MB
Created by: [2015.04.06]
2015.04.06
181
DATA NEEDS OF WATER SECTOR
Module covers about hydrology requirement, availability of surface and ground water, planning design and development of water resources, long term hydrological for climate change studies Click Here to Download 5MB
Created by: Dr. A.K. Lohani [2015.04.06]
2015.04.03
182
Sensor Specifications Version - 1
Macro enabled excel worksheet to generate hydromet sensor specifications. This sheet is useful to design standard bid document Click Here to Download 113KB
Created by: Dr. Anish Hydro-Informatics Expert, The World Bank [2015.11.16]
2015.03.04
183
Standard Bidding Document for Procurement of Goods under ICB
Standard Bidding Document for Procurement of Goods under International Competitive Bidding (ICB), revision dated March 2013 Click Here to Download 264KB
Created by: Team World Bank [2016.10.17]
2015.02.27
184
Standard Procurement Document for Selection of Consultants
This Standard Request for Proposals (SRFP) has been prepared by the World Bank and is based on the Master Procurement Document for Selection of Consultants (Master Document). The Master Document was prepared by participating Multilateral Development Banks (MDBs) and reflects what are considered best practices. Click Here to Download 429KB
Created by: Team World Bank [2016.08.17]
2015.02.27
185
Standard Bidding Document for procurement of civil works under ICB
user guide & Standard Bidding Document for procurement of civil works under ICB Click Here to Download 712KB
Created by: Team World Bank [2016.11.03]
2015.02.27
186
Standard Bidding Document for Procurement of Very Small Civil Works under NCB (US $1 Million)
Standard Bidding Document for Procurement of Very Small civil Works under National Competitive Bidding (US $1 Million) February 2015 Click Here to Download 106KB
Created by: Team World Bank [2016.11.03]
2015.02.27
187
Eflows in Water Policies, Plans and Projects
Created by: Rafik Hirji, World Bank [2015.02.05]
2015.02.05
188
Eflow Assessment Experiences in Developing Countries
Created by: Jay O’Keeffe, South Africa [2015.02.05]
2015.02.04
189
River Basin Planning & Eflow Assessment Experience in China
Created by: Robert Speed, Australia [2015.02.05]
2015.02.04
190
Ganga River Basin – Hydrological Regime
Created by: Dr. Sandhya Rao, IIT Delhi, tbc [2015.09.03]
2015.02.04
191
Ganga River Basin – Socio-Economic Values
Created by: Ritesh Kumar, Wetlands International [2015.02.05]
2015.02.04
192
Ganga River Basin – An Ecosystem Services Perspective
Created by: Vinod Tare, IIT Kanpur [2015.02.05]
2015.02.04
193
EU Water Framework Directive and Eflows
Created by: Mike Acreman, United Kingdom [2015.02.05]
2015.02.04
194
Management of Environmental Water in the Murray-Darling
Created by: David Papps, Australia [2015.02.05]
2015.02.04
195
Eflows Issues in Ganga Basin
Created by: N.N. Rai, Director, Hydrology, CWC [2015.09.09]
2015.02.04
196
Past and ongoing Eflow Assessments
Created by: Suresh Babu, WWF [2015.02.05]
2015.02.04
197
Presentation on interstate water management Tungabhardra Board case study
Presentation on interstate water management Tungabhardra Board case study. It includes genesis & history of project, roles and responsibilities of board, interstate water management and conflict management among states etc. Click Here to Download 18MB
Created by: Dr. S K Srivastava [2016.08.17]
2015.02.02
198
Integrating water quality management into river basin management
Created by: Fritz Holzwarth, Germany [2015.02.02]
2015.02.02
199
IWRM Implementation and Capacity Development of River Basin Organization: Case of Brantas River Basin
Created by: Indonesia Pak Tjoek, Indonesia [2015.09.03]
2015.02.02
200
Institutional Experiences in RBOs Across Asia
Created by: Dr Keizrul bin abdullah, Chairman NARBO [2015.09.01]
2015.02.02
201
World Bank IWRM Initiatives in India
Created by: Dr. William Young, World Bank [2015.09.08]
2015.02.02
202
ADB IWRM Projects (South & South East Asia)
Created by: Arnaud Cauchois and Clive Lyle, ADB [2015.02.03]
2015.02.02
203
National IWRM Guidelines
Created by: Shri A B Pandya, Chairman, CWC [2015.09.16]
2015.02.02
204
Proposed Institutional and Legislative Reforms with special emphasis on proposed River Basin Management Act
Created by: Shri M Gopalakrishnan [2015.02.03]
2015.02.02
205
Institutional Context for IWRM and River Basin Planning in Vhina
Created by: Clive Lyle, Consultant, Asian Development Bank [2015.09.09]
2015.02.02
206
Present/Future state of Water Data in India
Created by: Shri Yogesh Paithankar, Director CWC [2015.09.10]
2015.02.02
207
Decision Support Systems for IWRM
Created by: Dr. R.P.Pande, NIH, Roorkee [2015.02.03]
2015.02.02
208
Hydrological Modelling in India
Created by: Prof A.K. Gosain, IIT Delhi [2015.02.03]
2015.02.02
209
Presentation on Narmada Control Authority
Presentation on Narmada Control Authority. It includes functions & objective of NCA inclusive sardar sarovar dam etc. Click Here to Download 6MB
Created by: Shri Mukesh Chauhan [2016.08.17]
2015.02.02
210
Welcome and Achievement under Hydrology Project
Hydrology Project a Journey, Flood disasters in Maharashtra, Reservoir operating system, real hydromet system Click Here to Download 17MB
Created by: Shri Avanish Kant, MoWR, RD & GR [2015.02.04]
2015.02.02
211
Status of HP-3 PIP & Way Forward
Hydrology journey ahead, HP 3 project design, HP 3 vision, major issues and interventions, project components Click Here to Download 17MB
Created by: Dr. Anju Gaur [2015.02.04]
2015.02.02
212
Presentation of Tamil Nadu WRIS
Integrated GIS based web enabled data set for water stake holder department tamilnadu Click Here to Download 10MB
Created by: Mr. S.S. Rajagopal, SWaRMA, TN [2015.02.04]
2015.02.02
213
Opportunities for Integrated Water Resources Management in India
Created by: Professor Y.K. Alagh (Former-Member, Planning Commission) [2015.02.02]
2015.02.02
214
Murray Darling Basin Experience
Created by: Don Blackmore, Australia [2015.02.02]
2015.02.02
215
Environmental Flows in an IWRM Context
Created by: Dr. Mike Acreman, CEH, UK [2015.02.03]
2015.02.02
216
Presentation on Water resources of Maharashtra
Presentation on Water resources of Maharashtra by Maharashtra Water Resources Regulatory Authority. It covers Objective of MWRRA, organisation chart, key functions, entitlement program on irrigation projects etc. Click Here to Download 11MB
Created by: Dr. Suresh Kulkarni [2016.08.17]
2015.02.02
217
An Overview of integrated water resources management in Damodar Valley Corporation (DVC)
Presentation on the Overview of integrated water resources management in Damodar Valley Corporation (DVC) Click Here to Download 4MB
Created by: Shri Dipankar Chaudhary [2016.08.17]
2015.02.02
218
Integrated Water Resources Management
A framework for accessing water use sustainability in river basins, using data to make decisions, IWRM definitions, case study lemhi basin Click Here to Download 3MB
Created by: Carter Borden, World Bank [2015.02.04]
2015.02.02
219
Ideal PIP cost-table
PIP preparation for HP-3, tentative budget allocations, allocation for project components, unit cost rates and staff rates, Modal PIP from a medium to large state Click Here to Download 103KB
Created by: Johan Grijsen, World Bank [2015.02.04]
2015.02.02
220
Agenda for National Workshop on Integrated Water Resources Management
Detailed Agenda for National Workshop on Integrated Water Resources Management. Click Here to Download 375KB
Created by: Admin - IndiaWRM [2016.08.17]
2015.01.23
221
Standard Bid Document for Civil Works -National Competitive Bidding (Up to US $20 Million)
Standard Bid Document for Civil Works -National Competitive Bidding (Up to US $20 Million) Click Here to Download 304KB
Created by: Team World Bank [2016.11.03]
2015.01.01
222
Report on Internation Training Workshop
Report on Internation Training Workshop on Surface geophysics for ground water at CSIR- National Geophysics Reearch Institute at Hyderabad Click Here to Download 7MB
Created by: [2014.11.03]
2014.11.03
223
Project Completion Report on International Training Workshop
Project Completion Report on International Training Workshop on borehole geophysics for ground water by department of geology and geophysics, IIT Kharakpur Click Here to Download 2MB
Created by: [2014.11.03]
2014.11.03
224
Meteosat Flow Forecasting and Drought Monitoring
EARS Earth Environment Monitoring BV, Meteosat, energy and water balance monitoring system, rainfall processing Click Here to Download 12MB
Created by: Mark de Weerd, MSc. EARS Earth Environment Monitoring BV Delft, The Netherlands [2014.09.17]
2014.09.17
225
Tools for Flood Management
Tools for knowledge base, analysis and modeling, decision making and communication Click Here to Download 11MB
Created by: Guna Paudyal Senior Flood Management Specialist Managing Director, DHI-(India) [2014.09.10]
2014.09.10
226
Weather analysis and forecasting in modern age An overview
Numerical weather prediction, real time data and products from global NWP systems, porecast products Click Here to Download 4MB
Created by: Dr. K Prasad (Rtd. DDGM, IMD) Weather Risk Ltd. [2014.09.10]
2014.09.10
227
Flood Management and irrigation system rehabilitation solutions in indian context
Flood management, irrigation system rehabilitation solutions - pattamundai canal system in odisha Click Here to Download 6MB
Created by: AECOM [2014.09.10]
2014.09.10
228
Meteosat Flow Forecasting and Drought Management
EARS Earth Environment Monitoring BV, Energy and Water Balance Monitoring System , Meteosat, Energy en Water Balance Click Here to Download 5MB
Created by: AndriesRosema, EARS, Netherlands [2014.09.10]
2014.09.10
229
Multiple tools and techniques for water resources management Modern Tools and Techniques for Water Resources Assessment and Management
CSRIO overview, what we bring to water resources, supporting water resources management in south Asia, integrated water resources management Click Here to Download 6MB
Created by: Geoff Podger [2014.09.10]
2014.09.10
230
Multiple tools for water resources management by NIH
Himalayan water resources, Indus ganga brahputra basins, stream flow modelling, snow cover mapping from satellite data Click Here to Download 6MB
Created by: Dr. Sanjay Jain,NIH [2014.09.10]
2014.09.10
231
Ground Management Issues of Selected river basins with special reference to Hard Rock Aquifers,NIH
Definition of hard rock, groundwater availability, surface ground water interaction, components of ground water management Click Here to Download 5MB
Created by: [2014.09.10]
2014.09.10
232
Integrated Decision Support Tools for water resources management
Integrated Decision Support Tools for water resources management Click Here to Download 7MB
Created by: Jacob Host- Madsen, DHI, Denmark [2014.09.10]
2014.09.10
233
Flood Risk Management in Heavily Urbanized Floodplains
Flood Risk Management in Heavily Urbanized Floodplains Click Here to Download 2MB
Created by: Tuck Wai Lee & Mike Cope, CH2MHILL [2014.09.10]
2014.09.10
234
Practical Systems Modelling Approach for Effective IWRM Planning and Implementation
Practical Systems Modelling Approach for Effective IWRM Planning and Implementation Click Here to Download 4MB
Created by: Tuck Wai Lee, CH2MHILL [2014.09.10]
2014.09.10
235
Flood Risk Management in Heavily Urbanised Floodplains.
Flood Risk Management in Heavily Urbanised Floodplains. Click Here to Download 4MB
Created by: Bryan Harvey, MEng, MBA, MICE, CEng [2014.09.10]
2014.09.10
236
ReSyP :A package for Reservoir System Analysis& DSS for water resources planning in India
Silent features of NIH_ReSyP, analysis option, analysis ladder Click Here to Download 2MB
Created by: SK Jain and MK Goel, NIH, India [2014.09.10]
2014.09.10
237
Decision Support System Planning DSS (P)for Integrated River Basin Planning & Management,
All about decision support system Click Here to Download 4MB
Created by: Dr. M.K. Goel, NIH [2014.09.10]
2014.09.10
238
eWater Source
Models are used in developing and monitoring water management policy Click Here to Download 1MB
Created by: eWater [2014.09.10]
2014.09.10
239
Welcome note – Shri. Avanish Kant, Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India
Objective of water resource management, vision of national water information center, Click Here to Download 1MB
Created by: [2014.09.10]
2014.09.10
240
Hydrology Project Phase – III Approach towards Integrated Water Resources Management
Project Background, achievement under HP-1, silent features of HP-2,highlights of journey from HP1 to HP2. HIS, achievements under HP2, Click Here to Download 3MB
Created by: Narendra Kumar, Commissioner (B&B) [2014.09.04]
2014.09.04
241
India Water Week 2015 Hydrology Project: Integrated Water Resources Management
Hydrology Project journey ahead, HP3 Project Design and concept of hydrology Click Here to Download 3MB
Created by: Dr. Anju Gaur Senior Water Resources Specialist The World Bank [2014.09.17]
2014.09.04
242
Procurement Guidelines for Goods, works and Non Consulting Services
Guidelines - Procurement of Goods, works and Non Consulting Services Under IBRD Loans and IDA credits and Grant by World Bank Borrowers. Revised July 2014 Click Here to Download 685KB
Created by: Team World Bank [2016.08.17]
2011.01.01
243
Procurement Guidelines - Selection and Employement of Consultant
Guidelines - Selection and Employment of Consultant, Under IBRD Loans and IDA credits and Grant by World Bank Borrowers.Revised July 2014 Click Here to Download 641KB
Created by: Team World bank [2016.08.17]
2011.01.01