Live Discussion

SNO. Date & Time Headline Details Web/Galley Link Publish by
1 2016/08/17 Online Registration for training is now also available on the website. Online Registration for training is now also available on the website in addition to internal MIS system. Please apply online for all the upcoming training programs. Click Here Hitesh Thakur
2 2016/02/26 Training needs assessment under National Hydrology Project Onging Regional workshop by NIH for training needs assessment under National Hydrology Project Click Here D.R. Dhakal
3 2016/02/25 Ganga Basin Risk Atlas at Patna Workshop Dr. Satya Priya from World Bank presenting paper on Ganga Basin Risk Atlas and Dr. Saroj kumar verma from FMISC, WRD, Patna delieberating on National Hydrology Project in Patna Workshop Click Here Dr. Saroj Kumar, FMISC
4 2016/02/25 Expert Consultation Workshop in Bihar Expert Consultation Workshop on improving Flood Risk Management in Bihar (18-19 February 2016) Click Here Dr. Saroj Kumar
5 2016/02/25 Short and medium term vision for hydro-met testing facility by CWPRS Thank you very much CWPRS for sharing your short term and medium term vision for hydro-met testing facility. I was really impressed with the preparation of team. Look forward to celebrating your centenary with big bang in June Click Here Dr. Anju Gaur
6 2016/02/24 Workshop at BBMB Regional workshop at BBMB Chandigarh on 19th February. Thanks to BBMB and all other participants Click Here Sanjay Jain NIH
7 2015/11/26 Information on existing Hydromet Stations Dear all Please take priority to send the information on Hydromet Stations ASAP. For those agencies who do not have details, kindly send a mail informing the same Click Here Dr. Raj, The World Bank
8 2015/11/19 Thanks Team Assam for the Warm Welcome On behalf of all the participants, I sincerely thank WRD Assam for the warm welcome and for being an excellent host in the just concluded World Bank Procurement Training at Guwahati Click Here Hamlet Khiangte
9 2015/10/28 Procurement Training to be held in Guwahati Can there be official letter or email so that we can get permission from Government Click Here Hamlet Khiangte
10 2015/10/28 Procurement Training to be held in Guwahati Please make a note that those officials who have attended similar procurement training earlier like the one in the Pune are NOT ELIGIBLE for this training in Guwahati Click Here Dr. Raj
11 2015/10/20 Procurement Training to be held in Guwahati We appreciate and welcome the procurement training to be held in Guwahati next month... shall be nice if hydromet. Instrumentation is also touched upon. mean while a training on Project Hydrology aspect in planning and preparation of DPR is also being organized by CWC at new delhi Click Here Sobu, Nagaland
12 2015/10/19 Announcement, Training program on Procurement Procedures Announcement, Training program on Procurement Procedures of world bank will be held in Guwahati between 16-18 November 2015 Click Here Dr. Raj
13 2015/09/11 Project Preparation Guidelines Dear all, please refer to project preparation guidelines for hydromet instrument cost unit price estimates. Thanks Click Here Admin
14 2015/09/07 Proposal for the center of excellence Friends from north eastern states, remember to take a copy of the proposal for the center of excellence at Guwahati from me tomorrow. Click Here Avnish Kant
15 2015/09/06 Contact Database Update I request all agencies to update contact database so that communication goes to right person Click Here Dr. Anju Gaur
16 2015/09/06 Regarding revised PIP formats On popular public demand, we included excel sheets so that agencies do not have difficulties in summing or multiplication Click Here Avnish Kant
17 2015/08/31 Revised PIP Dear all new revised detailed PIP has been uploaded in the excel format. Please have a look on newly updated PIP because this format is little different than original word format. Click Here Admin
18 2015/08/31 Revised Detailed PIP in Excel Format This formats workability is good. Thanks Click Here Bhavani Rama
19 2015/08/31 Exposure Visit Assam officials in Telangana. Ground Water Department Click Here Mahesh Kumar
20 2015/08/27 World Bank Mission for NHP :Revised Agenda Dear all, On the basis of requests receives from ganga basin states and Kerala government, the agenda has been slightly changed. The revised agenda will be placed in the website very shortly. All are requested to attend the mission as per revised agenda Click Here Avanish
21 2015/08/26 Reminder for Water Quality Information This is just to remind that only 7 agencies (IRI - Uttrakhand, West Bengal, Bihar Surface Water, Karnataka, CWC, Mizoram and Gujarat) has submitted the Water Quality Information. All such information or data is required at the time of National Hydrology Project Mission. So we are requesting here to fill and submit the information as soon as possible. Click Here Admin
22 2015/08/24 National Hydrology Project Mission from September 1st to 15th, 2015 Central agencies may add information as applicable instead of following it strictly. They should provide detailed plan how they will support the agencies Click Here Dr. Anju Gaur
23 2015/08/24 Wrap up Meeting There will be two days wrap up on September 14-15 & Central Agencies will be required to present their program and how they will support the implementing agencies Click Here Dr. Anju Gaur
24 2015/08/03 Thanks to Arun Team & NWA for equipping with procurement procedures. Thanks to Arun Team & NWA for equipping with procurement procedures. Now I request you all to submit the procurement plan at least for first 18months Click Here Dr. Anju Gaur
25 2015/06/15 Hydromet training in shimla from 29th June. I hope you all are aware about hydromet training in shimla from 29th June. Click Here Avnish Kant
26 2015/06/05 Thanks to NIH Initiatives and GMRC .. Thanks to NIH Initiatives and GMRC for organising this funtastic course #HEC Training Click Here Dr. Anju Gaur
27 2015/06/05 Ministry Listed last one year achievements Ministry Listed last one year achievements, see link on NHP website Click Here Dr. Anish
28 2015/06/04 Participate in the NWA Procurement Training Requesting all who wish to Participate in the NWA Procurement Training Click Here Mr. Arun

Events List

SNO. Date & Time Event Detail Web link
1 2016/12/30 Advanced Training on Basin Planning and modelling using Riverware software at Ahmedabad 30-Jan 2017 to 3 Feb 2017 View Doc
2 2016/12/20 Training Program on HEC Modelling software at Roorkee Rescheduled from "6-11 Feb 2017" to 20-25 Feb, 2017 View Doc
3 2016/12/14 EoI for Integrated Water Resources Management Studies in respect of three Indian River Basins (Krishna, Godavari, And Mahanadi) View Doc
4 2016/12/13 Template for location of Hydromet Stations under NHP View Doc
5 2016/12/05 Final List of Participants regarding Training Program on World Bank New Procurement Tracking System - STEP at New Delhi View Doc
6 2016/12/04 Detailed Table for stations (Appendix to Technical Specifications) for inclusion in Hydromet Bid, example form Chhattisgarh View Doc
7 2016/11/30 Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences from 19th December 2016 to 27th January 2017 by NWA View Doc
8 2016/11/23 Template for Bank Mandate form View Doc
9 2016/11/19 Addendum to request for proposal for empenalment agreement for hydromet and water quality equipment View Doc
10 2016/10/27 Schedule - International Seminar on Reliable Data Acquisition system for integrated water resources Management View Doc
11 2016/10/27 Inauguration Schedule - International Seminar on Reliable Data Acquisition system for integrated water resources Management View Doc
12 2016/10/26 Training on River Basin Planning using Waterware Software from 14th to 18th Nov, 2016 at Kolkata under NHP View Doc
13 2016/10/25 Three Training Programs on World Bank Procurement application (STEP) by Procurement Experts from World Bank during November 2016 at Delhi, Chennai, Kolkata View Doc
14 2016/10/17 List of e-GP systems cleared by The World Bank View Doc
15 2016/10/17 Template for assessment of E - procurement system View Doc
16 2016/10/06 Invitation for signing of MOA under National Hydrology Project on 14.10.2016 View Doc
17 2016/10/06 Delft3D webinar - Morphological model of the River Rhine branches from the concept to the operational model View Doc
18 2016/10/05 Hydromet instrument to prevent inter state water disputes - Economic Times (India (SAR)) View Doc
19 2016/09/27 Advertisment of invitation for proposal (IFP) for empanelment of equipment supplier View Doc
20 2016/09/23 Approved List of Participants regrading Training Program on World Bank Procurement Procedures hosted by WRD Meghalaya on 29th and 30th September View Doc
21 2016/09/21 Final List of Participants for Training on Basic Hydrology View Doc
22 2016/09/21 Final List of Participants for Training Course on Ground Water and Transport Modelling View Doc
23 2016/09/06 Telemetry hydro-met stations for result frame work including baseline and project end target View Doc
24 2016/09/02 Training Program on World Bank Procurement Procedures by Procurement Experts from World Bank during September 26-27, 2016 at Shillong, Meghalaya. View Doc
25 2016/09/01 Three Training Courses to be organised by NIH in the month of September & October regarding Basic Hydrology, Surface Water Modelling, Ground Water and Transport Modelling. View Doc
26 2016/08/31 Approved list of trainees for the 3rd training program on “River Basin Planning using HEC-RAS” at Department of Hydrology, IIT Roorkee, from 5th to 10th Sept, 2016. View Doc
27 2016/08/23 Postponed: International Seminar On National Hydrology Project: Towards a Reliable Data Acquisition for IWRM 29 Sept – 1 Oct 2016 Pune, India View Doc
28 2016/08/22 Template for bench-marking of Water Data Centers and the Water Institution View Doc
29 2016/08/22 Basin-state matrix for major activities under project View Doc
30 2016/08/16 Training on River Basin modelling using HEC - RAS software under NHP, Department of Hydrology, IIT Roorkee from 5th to 10th September View Doc
31 2016/07/18 The world Bank Mission under National Hydrology Project from 1st to 5th August, 2016 View Doc
32 2016/07/04 List of Participants for course on river basin planning using HEC software from 11th July to 15th July 2016 View Doc
33 2016/06/29 Training Course on Ground Water and Transport Modelling during Sept 26-30, 2016 at NIH Regional Centre, Kakinada View Doc
34 2016/06/24 Approval of the cabinet for the implementation of National Hydrology Project View Doc
35 2016/05/30 International Program on PROCUREMENT PROCEDURES FOR THE WORLD BANK AIDED PROJECTS (July 11-22, 2016) View Doc
36 2016/05/30 Course on River Basin Planning using HEC software from 11th to 15th July, 2016 View Doc
37 2016/05/17 Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP View Doc
38 2016/05/17 Newspaper advertisement for Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP View Doc
39 2016/05/12 Final list of participants for course on river basin planning using HEC software at IIT Roorkee View Doc
40 2016/05/11 Revised Cost Tab May 10th 2016 View Doc
41 2016/05/03 Constitution, Function and Responsibility of NPMU under NHP and work distribution thereof-reg. View Doc
42 2016/05/02 Course on River Basin Planning using HEC Software from 16th to 20th May 2016 at IIT - Roorkee View Doc
43 2016/04/29 Orientation programme for the Nodal Officers on 9th May, 2016, at The World Bank office View Doc
44 2016/02/24 Registration for Groundwater Modelling at Kolkata from March 14 - 18, 2016 View Doc
45 2016/02/23 Agenda for Groundwater modelling training at Kolkata 14th to 18th March 2016. View Doc
46 2016/02/23 Link to NASA Online Flood Management Training View Doc
47 2016/02/21 Artists works to feature in World Bank calender View Doc
48 2016/02/11 List of Participants for Training of Trainers at CWPRS Pune from 15-19 February 2016 View Doc
49 2016/02/11 Schedule for regional workshops by NIH for training needs assessment under National Hydrology Project View Doc
50 2016/02/04 Registration Closed for :Training of Trainers on Hydrometeorological and WQ instruments under National Hydrology Project View Doc
51 2016/02/03 Training of Trainers on Hydrometeorological and WQ instruments under National Hydrology Project View Doc
52 2016/01/22 Workshop on stakeholders involvement and participation is being organized at Hotel Shangri - La, Janpath, New Delhi on Friday 29th January View Doc
53 2016/01/15 Invitation for "Integrated Water Management for Irrigation Networks and Flood Management- International Best Practices" 21-22 January, 2016 View Doc
54 2016/01/08 Invitation for the national seminar conducted by APGW View Doc
55 2016/01/08 Brochure for the national seminar conducted by APGW View Doc
56 2015/12/01 Letter to implementing agencies regarding National Hydrology Project - EFC dated 26th November 2015‏ View Doc
57 2015/11/12 List of Participants for training on world bank procurement procedure Guwahati View Doc
58 2015/11/06 Agenda for Training on world bank procurement procedure at Guwahati View Doc
59 2015/11/02 Framework Agreement Document :Word as well PDF formats View Doc
60 2015/10/28 Training on World Bank Procurement Procedure at Guwahati from 16-18 Nov. 2015. View Doc
61 2015/10/28 Summary Report on India National Groundwater Meeting: Scoping a National Reform Agenda View Doc
62 2015/09/28 Workshop on India Ground Water - Scoping a National Reform Agenda View Doc
63 2015/09/14 National Hydrology Project Wrap-up (September 14-15, 2015) View Doc
64 2015/09/11 National Hydrology Project Wrap-up (September 14-15, 2015) Final Agenda View Doc
65 2015/08/27 Revised Schedule for World Bank Mission for NHP: 1-14 September 2015 View Doc
66 2015/08/26 World Bank's Mission Under National Hydrology Project from 1st to 15th September 2015 View Doc
67 2015/08/25 Coming soon: Early flood warning system View Doc
68 2015/07/11 AP CS holds review on Hydrology Project View Doc
69 2015/06/14 UP State irrigation department is managing flood with cloud View Doc
70 2015/06/05 Training on WB procurement procedures at NWA from 27th to 31st July 2015 View Doc
71 2015/06/05 Training on Hydro-met network design at Shimla from 29th June to 3rd July 2015 View Doc
72 2015/06/04 Achievements of the MOWR, River Development and Ganga Rejuvenation View Doc
73 2015/05/30 Training Program - Introduction to HEC based modelling Solution View Doc
74 2015/05/26 Final List for Participants for HEC Training, 1-5 June 2015, NIH Roorkee View Doc
75 2015/05/10 Advance Flood Warning System at Bhakra, Pong View Doc
76 2015/03/20 Training on Hydromet system in April 6-11 (Register Closed) View Doc
77 2015/02/15 Groundwater levels to be recorded 24x7 - The Times of India View Doc
78 2015/01/28 Bengal to get World Bank aid to be ready for cyclone View Doc
79 2014/12/29 Nationwide hydrology data soon - The Hindu View Doc

Project Diary

SNO. Date & Time Event Detail Web link
1 2016/10/06 Invitation for signing of MOA under National Hydrology Project on 14.10.2016 View Doc
2 2016/07/18 The world Bank Mission under National Hydrology Project from 1st to 5th August, 2016 View Doc
3 2016/06/24 Approval of the cabinet for the implementation of National Hydrology Project View Doc
4 2016/05/03 Constitution, Function and Responsibility of NPMU under NHP and work distribution thereof-reg. View Doc
5 2016/04/29 Orientation programme for the Nodal Officers on 9th May, 2016, at The World Bank office View Doc
6 2015/12/01 Letter to implementing agencies regarding National Hydrology Project - EFC dated 26th November 2015‏ View Doc
7 2015/08/26 World Bank's Mission Under National Hydrology Project from 1st to 15th September 2015 View Doc

Documents List

SNO. DocID Doc Type Doc Desc Contents Date Link Author
1 7317 TRAININGS Installation Package for Riverware Software The package contains software installation, data and example model 2017/01/16 Edie
2 7315 TRAININGS Instructions for downloading and installing River Ware Software Instructions for downloading and installing River Ware Software, designed for Riverware training at Ahmedabad 2017/01/16 docx Edie
3 7316 TRAININGS Instructions for downloading and installing River Ware Software Instructions for downloading and installing River Ware Software, designed for Riverware training at Ahmedabad 2017/01/16 docx Edie
4 7314 PROCUREMENT Document for procurement of DWLRs DWLR for 9 states, 585 number 2017/01/13 pdf CGWB
5 7309 TRAININGS Postponement the Course on HEC software from 6th 20th – 25th Feb 2017 Postponement of the 4th Course on ‘River Basin Planning using HEC software’ at IIT-Roorkee, scheduled from 6th – 11th Feb, 2017 to 20th – 25th Feb, 2017 under NHP– reg. 2017/01/10 pdf NPMU, MoWR, RD & GR
6 7300 TRAININGS ‘River Basin Planning using HEC software’ from 6th to 11th February, 2017 4th Course on ‘River Basin Planning using HEC software’ from 6th to 11th February, 2017 under NHP at IIT-Roorkee– reg 2016/12/30 pdf NPMU, MoWR, RD & GR
7 7294 PROCUREMENT General procurement Notice India National Hydrology Project General procurement Notice India National Hydrology ProjectbLoad / Credit No (To be Finalised) 2016/12/27 pdf
8 7289 PROCUREMENT Bid Document for construction of Data Centre at Mohali, Punjab Civil Works bid document used by Punjab for construction of Data Center Building at Mohali, Punjab. The construction was done under HP-2 2016/12/27 doc Punjab
9 7276 PROCUREMENT Standard Bidding Document for Shopping of Goods (E5) E5 - Standard bidding document for procurement of Goods under shopping method. This document may be used for small procurements and inviting quotations from eligible suppliers. 2016/12/19 doc World Bank
10 6274 PROCUREMENT Example Bid document for hiring man power through HR Agency Example Bid document for hiring man power through HR Agency. This can be used for many situations like computer operator, data entry operator, account assistant etc. 2016/12/15 doc
11 6245 TRAININGS Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science from 19th December 2016 to 27 January 2017. Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science at National Water Academy in association with World Meteorological Organisation from 19th December 2016 to 27 January 2017. 2016/11/30 pdf Datta kumar Chaskar Director & Program Co-coordinator National Water Academy, CWC
12 6244 NOTIFICATIONS Letter for registration: Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences,, being organized by the National Water Academy NWA) in association with World Meteorological Organization (WMO) 2016/11/30 pdf D S Chaskar, Director - Designs & Program Coordinator National Water Academy (NWA)
13 6193 WORKSHOPS Reservoir Operations in Bhakra Beas River System Reservoir Operations in Bhakra Beas River System 2016/11/17 pptx Anil Byas, BBMB
14 6192 WORKSHOPS INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS - TAMIL NADU 2016/11/17 pptx Public Works Department, Water Resources Department.
15 6191 WORKSHOPS SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA 2016/11/17 ppt Water Resources Department, Govt of Karnataka
16 6190 WORKSHOPS Presentation on Automation of Dams/Barrages in U.P. with the help of SCADA System Automation of Dams/Barrages in U.P. with the help of SCADA System 2016/11/17 pptx Mr. Navin Kapoor, Superintending Engineer
17 6189 WORKSHOPS India Waris - Web GIS Generation of Database and Implementation of Web Enabled Water Resources Information System in the Country 2016/11/17 ppt Yogesh Pathainkar, CWC
18 6188 WORKSHOPS Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha 2016/11/17 pdf Dr. Ritesh Kumar, Wetlands International South Asia & Dr. AjitPattnaik, Chilika Development Authority
19 6187 WORKSHOPS WR2012 system - Water information management system for South Africa, Lesotho and Swaziland. WR2012 system - Water information management system for South Africa, Lesotho and Swaziland. Credits: South Africa National Department of Water & Sanitation, SA Water Research Commission, Bill Pitman, Allan Bailey, Marieke de Groen 2016/11/17 pptx Ian Rushton, Royal Haskoning DHV, Netherlands
20 6186 WORKSHOPS Integrated water data management and irrigation water needs - case study of HAIS Guadiana River Integrated water data management and irrigation water needs - case study of HAIS Guadiana River 2016/11/17 Luis Martin EPTISA Spain
21 6179 WORKSHOPS Building knowledge and technology through collaborative water monitoring Building knowledge and technology through collaborative water monitoring 2016/11/17 pptx Paul Wilson, Government of Victoria , Australia
22 6178 WORKSHOPS Promoting IWRM at national, international and cross-national level Promoting Integrated Water Resources Management at national, international and cross-national level - UNDP - DHI Partnership (Center on Water and Environment) 2016/11/17 pptx Hans Chr. Ammentorp, Denmark
23 6177 WORKSHOPS NHI: the Netherlands Hydrological Instrument NHI: the Netherlands Hydrological Instrument 2016/11/17 pptx Kee Bons, Deltares, Netherlands
24 6176 WORKSHOPS Australia Water Partners for development helping to manage water scarcity in the indo pacific Understanding the water resources base, River Basin planning & water allocation framework, governance reforms & institutional straightening, managing demand & improving efficiency 2016/11/17 pptx Alluvium Consulting and AWP Partner
25 6175 WORKSHOPS PRESENTATION on reliable data acquisition system PRESENTATION on reliable data acquisition system 2016/11/17 pptx PAN INDIA CONSULTANTS PVT. LTD.
26 6174 WORKSHOPS Komoline Aerospace Limited INDIA Hydrology Measurement Solutions with Smart Sensing 2016/11/17 ppt Team Komoline
27 6173 WORKSHOPS DHIs Data and Sensor strategy Data Acquisition, Management, Decision Support and Operations DHI Data and Sensor strategy Data Acquisition, Management, Decision Support and Operations 2016/11/17 pptx Dr. Ole Larsen, DHI
28 6172 WORKSHOPS DHI The expert in WATER ENVIRONMENTS DHI Softwares - The expert in WATER ENVIRONMENTS 2016/11/17 pptx Sajid Alam-Manager MIKE Powered by DHI
29 6171 WORKSHOPS Sutron Corporation Designing answers that go beyond the expectations of Hydromet professionals to support them in caring for the world’s water 2016/11/17 ppt Team Sutron
30 6170 WORKSHOPS ALM Systems - Smart Instrumentation for the water industry Automation and Maintenance Management Systems SMART INSTRUMENTATION FOR THE WATER INDUSTRY 2016/11/17 pptx Hugo Schmalz & Prakash Muthuswamy
31 6168 WORKSHOPS Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES 2016/11/17 pptx ARUSHI BHALLA & MANISH MEHTA
32 6166 WORKSHOPS SWAN ENVIRONMENTAL SWAN ENVIRONMENTAL Private Limited 2016/11/16 ppt SWAN ENVIRONMENTAL
33 6164 WORKSHOPS SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry 2016/11/16 pptx Jens Petry
34 6163 WORKSHOPS ALS Hydrographics at a Glance Reliable Data Acquisition System for Integrated Water Resource Management 2016/11/16 pptx ALS Hydrographics
35 6162 WORKSHOPS KISTERS at a glance International Seminar on the National Hydrology Project 2016/11/16 pptx William Steen
36 6161 WORKSHOPS Rubicon Water Measurement, Monitoring, Control & Mgt. solutions Rubicon Water Measurement, Monitoring, Control & Mgt. solutions 2016/11/16 pptx Dr. Ajay Pradhan (Adviser)
37 6160 WORKSHOPS Xylem Analytics Environmental Monitoring Systems & Solution Xylem Analytics Environmental Monitoring Systems & Solution 2016/11/16 pptx Xylem Water Solutions India Pvt. Ltd.
38 6159 WORKSHOPS Smart Digital Integrated Water Resource Management & Control System Smart Digital Integrated Water Resource Management & Control System 2016/11/16 pptx Mechatronics System Private Limited
39 6158 WORKSHOPS Water Quality Acquisition System in Australia Water Quality Acquisition Systems in Australia 2016/11/16 ppt Chris O Neill - Hydronumerics and AWPPartner
40 6157 WORKSHOPS Ground Water Monitoring and Data Management System in Denmark Ground Water Monitoring and Data Management System in Denmark 2016/11/16 pptx Ole Larsen, Danish Ground Water Forum
41 6156 WORKSHOPS Ground Water Monitoring System in Andhra Pradesh Real Time Groundwater and other Water Resources Monitoring for Real Time Governance 2016/11/16 pptx Dr. Venugopal Rao Andhra Pradesh GWD
42 6155 WORKSHOPS Hydro-Meteorological Data Acquisition System in Australia Hydro-Meteorological data 2016/11/16 pptx Paul Sheahan, Bureau of Meteorology, Australia and AWP Partner
43 6154 WORKSHOPS Hydro-Meteorological Network Assessment and Improvement Best practices for hydro meteorological network design, revision and improvement of existing infrastructures 2016/11/16 pptx Levis Franky EPTISA Spain
44 6153 WORKSHOPS National Hydrology Project Overview and Readiness - National Hydrology Project 2016/11/16 ppt Niraj Manglik & Avanish Kant, Ministry of Water resources, River Development and Ganga Rejuvenation
45 6152 WORKSHOPS Theme Introductory Presentation - Hydrological Data Global Water Needs 2016/11/16 pptx Dr. Nagaraja Rao Harshadeep, Lead Environment Specialist, The World Bank
46 5130 TRAININGS Letter for the approved list of trainees for the training program on River Basin Planning using waterware software Letter (No: X-94012/4/2016-NHP/2411-2414) for the approved list of trainees for the training program on River Basin Planning using waterware software from 14th to 18th November 2014, at Kolkata being organised by DVC 2016/11/11 pdf Team NPMU
47 5032 TRAININGS Letter for training on River Basin Planning using Water-ware Software at Kolkata under National Hydrology Project Letter (No.: X-94012/4/2016-NHP) for training on River Basin Planning using Water-ware Software from 14th to 18th November, 2016 at Kolkata under National Hydrology Project 2016/11/07 docx MOWR
48 5018 NOTIFICATIONS Notification for Waterware training at Kolkata 14-18 Nov Notification and invitation for nomination for waterware training at Kolkata 14-18 Nov 2016/11/02 pdf MoWR
49 4975 PROCUREMENT Filled template for assessment of e-Procurement by Team CWC Assessment of Compliance of the e-GP System with the MDB e-GP requirements for MDB Loans, Grants and Credits 2016/10/17 doc Team CWC
50 3976 PROCUREMENT Standard Bid Document for procurement of goods under NCB Standard Bid Document for procurement of goods under National Competitive Bidding (NCB) (Document E1, Revised Feb 2015 ) 2016/10/17 docx The World Bank
51 3953 NOTIFICATIONS Do Letter regarding signing of memorandum of agreement inclusive program Agenda for 14th October 2016 DO Letter (D.O.No. G72018/1/2016/NHP/2104/41) by ministry of water resources to all the implementing agencies regarding signing of memorandum of agreement with detailed agenda. 2016/10/06 pdf Team MOWR
52 3945 WORKSHOPS Invitation for International Seminar at Pune Invitation for International Seminar on Reliable Data Acquisition System for Integrated Water Resources Management 7-8 November, 2016 Hotel Hyatt Regency Weikfield IT Part, Pune organised by Central Water and Power Research Station, Pune. Indian Society for Hydraulics, CWPRS, Pune 2016/10/05 docx Team CWPRS
53 3944 MISSIONS The Aide Memoire - National Hydrology Project, Appraisal Mission , August 1-5 , 2016 A World Bank project appraisal mission was conducted from August 1 to 5, 2016 for the National Hydrology Project (NHP). The mission objectives were to appraise the project and assess the readiness of project for negotiation. The Aide Memoire summarizes mission findings and the status of project preparation 2016/10/04 pdf The World Bank
54 3943 MISSIONS Management Letter regarding Project Appraisal Mission (August 1-5 , 2016), Summarizing the missions finding and status of the project Preparations Aide Memoire Summarizing the missions finding and status of the project Preparations regarding detailed discussions with central and state agencies grouped according to major river basins in Delhi and the wrap-up meeting was concluded under the chairmanship of Dr. Amarjit Singh, Officer on Special Duty, MoWR, RD&GR 2016/10/04 pdf The World Bank
55 3932 PROCUREMENT invitation for proposals (IFP) for empanelment of equipment supplier invitation for proposals (IFP) for empanelment of equipment supplier under Empanelment agreement 2016/09/28 doc Team CWC
56 3930 PUBLICATIONS Project Brochure for National Hydrology Project, September 2016 Brochure - National Hydrology Project. Project objective is to extend , quality and accessibility of water resources information and to strengthen the capacity of targeted water resources management institutions in India 2016/09/27 pdf Team World Bank
57 3929 PUBLICATIONS Workshop brochure for International Seminar on Reliable Data Acquisition System for integrated Water Resources System Brochure - International Seminar on Reliable Data Acquisition System for integrated Water Resources System on the occasion of CWPRS Centenary Year 2016. from 7th to 8th November 2016, Hotel Hyatt Regency, Pune. 2016/09/27 pdf Team CWPRS
58 3916 NOTIFICATIONS Approved Memorandum of Agreement and Financial Management Guidelines under National Hydrology Project Memorandum of Agreement (MoA) under National Hydrology Project between Ministry of Water Resources, River Development & Ganga Rejuvenation and Project Implementing Agencies 2016/09/17 docx Team NHP
59 3911 NOTIFICATIONS Government Letter (X- 94012/4/2016-NHP/1824) Training Program on Procurement Procedures Government Letter regarding two days training program on World Bank Procurement Procedures from 29th to 30th September 2016 at Shillong Meghalaya under National Hydrology Project 2016/09/14 pdf Team MOWR - NHP
60 3909 TRAININGS Letter (No X-94012/4/2016-NHP/4297)for Training on River Basin Planning using River ware software Letter for Training on River Basin Planning using Riverware Software from 30 January to 3 February 2017 at Ahmedabad under NHP- reg. 2016/09/08 pdf Team MOWR
61 3906 TRAININGS Government Letter ( No. NHP/T-/2016-NIH/1003 ) regarding Surface water modelling at NIH, Belgaum under NHP Government Letter to all the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of a 5-Day Training Workshop on “Surface water modelling" during Oct. 17-21, 2016 at RC, NIH, Belgaum under NHP. 2016/09/02 pdf Team NIH
62 3905 TRAININGS Government Letter (No. NHP/T-/2016-NIH/1002 ) Regarding training on Basic Hydrology at CFMS, NIH, Guwahati Government Letter to All the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of a 5-Day Training Workshop on “Basic Hydrology" during September 26-30, 2016 at CFMS, NIH, Guwahati. 2016/09/02 pdf Team NIH
63 3904 TRAININGS Government Letter (No. NHP/T-/2016-NIH/1001), regarding Ground Water and Transport Modelling at RC, NIH, Kakinada Government Letter to All the Nodal Officers & Training Coordinators of the NHP Implementing Agencies regarding Organization of 5-Day Training Workshop on “Ground Water and Transport Modelling" during Sept. 26-30, 2016 at RC, NIH, Kakinada under NHP. 2016/09/02 pdf Team NIH
64 3890 HIS A small write-up on Cloud server and its comparison with physical server This document explains various parameters about cloud server, the comparison of cloud server vs physical server, the cost of cloud services and description about backup features provided by cloud server. 2016/09/01 docx World bank
65 3889 HIS HIS manual for Hydromet Systems Hydromet manual contains chapters on network design density, site selection, instrument selection, specification, installation guidelines, telemetry etc. The content covers Surface water instruments (like water level, rain gauges, automatic weather station) Ground water and water Quality aspects. 2016/09/01 docx World bank
66 3882 HIS Comparison of VSAt and INSAT Radio based satellite telemetry The selection of INSAT radio vs VSAT based satellite telemetry depends on many factors like location, availability of space, requirement of one way or two way communication etc. A comparison of two telemetry methods based on these parameters is provided in the document 2016/08/31 docx World Bank
67 3877 WRITE-UP Sample Implementation Arrangement Document from State of West Bengal & Telangana Sample State Project Management Unit Implementation Arrangement Document from State of West Bengal & Telangana 2016/08/28 zip Team NHP
68 2869 M & E Basin-state matrix for major activities under project This document list the sub-basins falling under each states. The columns are provided for major project activities like flood forecasting, river basin planning, hydromet etc. The agencies should fill the current status of these activities in state, and proposed activities in the project 2016/08/22 xlsx Team NHP
69 2868 M & E Template for bench-marking of Water Data Centers and the Water Institution This document lists the questions required for bench-marking water data centers and the institution as whole. There would be a marking system, which will help in evaluation current baseline and project end targets for institutional capacity. Agencies should provide feedback on the template, to make sure that major elements of the bench-marking are covered. 2016/08/22 xlsx Team NHP
70 2865 PROCUREMENT Threshold for procurement method and prior review This document define the threshold applicable for NHP regarding different procurement types like Goods, Works, Consultancy and Different Procurement methods like ICB, NCB Shopping. The threshold for prior and post review are also defined 2016/08/21 docx Team World Bank
71 2830 NOTIFICATIONS Official Letter for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee Official Letter (Letter no: G-72012/1/2016-NHP/1619-1621) for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee 2016/08/19 pdf Mr. Avanish Kant
72 2818 PROCUREMENT Standard Procurement Document , Standard request for proposals (Trial version of electronic procurement ) Selection of Consultants V1.0 July 2012 This trial version of Standard Request for Proposals for the use in electronic procurement (SRFP) has been prepared by the World Bank on the basis of the World Bank Standard Request for Proposals dated October 2012. This SRFP can be used with different selection methods described in the Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers, dated January 2011 (Consultants Guidelines), including Quality- and Cost-Based Selection (QCBS), Quality-Based Selection (QBS), Selection under a Fixed Budget (FBS), and Least-Cost Selection (LCS). When mandating the use of this SRFP on the implementing agency, however, primary consideration should be given to the complexity and value of the assignment 2016/08/17 docx Team World Bank
73 2802 PIP Telangana Ground Water Proposed Organogram – NHP Telangana Ground Water Proposed Organogram – National Hydrology Project 2016/08/09 pptx Team Telangana GW
74 2792 M & E Draft framework for monitoring and evaluation indicators The list of project indicators, by component, is provided in this document. The agencies should go through the indicators, provide feedback and set baseline (situation as on today) and project end target against each indicator. 2016/08/02 docx Team NHP
75 2758 HIS A questionnaire for Hydromet Design for reservoirs while preparing bid document A questionnaire has been prepared to guide implementing agencies in deciding the right technology (Telemetry, water level sensor) for integrated reservoir monitoring. The questionnaire will guide the agency while preparing bid documents for Hydromet of Reservoir / Barrage monitoring. 2016/07/22 docx World Bank
76 1755 MISSIONS World Bank Mission Under National Hydrology Project from 1st to 5th August, 2016 The Ministry of Water Resources , River development and Ganga Rejuvenation (MOWR, RD & GR) is coordinating the implementation of the National hydrology projects as a central sector scheme with world bank assistance. The world bank mission id to review the readiness of NHP in respect of all the implementing agencies. 2016/07/18 pdf MOWR
77 1748 PROCUREMENT Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP Invitation of online Expression of Interest for engaging Consulting Services for the Technical Assistance and Management Consultancy under National Hydrology Project. 2016/05/18 pdf Ministry of Water Resources
78 2769 PIP Preparation of a Work-Plan for Year 1 and Year 2 Work Plan is an outline of phasing project activities to be carried out in a financial year including its physical and financial aspects 2016/05/10 xlsx Team NHP
79 2770 PIP Preparation of a Procurement Plan for the first 18 months Procurement Plan detailing out procurement activities envisaged to be carried out during a financial year including its financial aspects 2016/05/10 xls Team NHP
80 2765 PIP The detailed Project Cost Estimate Table Component, activity and sub activity wise cost estimate table 2016/05/10 xlsx Team NHP
81 2768 PIP  The Detailed Project Implementation Plan (PIP) Report Project (NHP) - central as well as states  The Detailed Project Implementation Plan (PIP) Report is a pre-requisite document that needs to be prepared by all the implementing agencies of the National Hydrology Project (NHP) - central as well as states 2016/05/10 docx Team NHP
82 1355 WORKSHOPS NHP Implementation strategy The presentation on NHP Implementation strategy covers, Implementation arrangement (NPMU/ TAMC/SPMU), Fund Flow and Audit Mechanism, Project Monitoring Mechanism (Physical & Financial Monitoring) and Status of PIP 2016/05/10 ppt Avanish Kant
83 1356 WORKSHOPS Overview of Financial Management under NHP The presentation provides overall overview on financial management which covers, Budgeting, fund flow, accounting, staffing , IUFR, external and internal audit 2016/05/10 pptx Krishna
84 1353 WORKSHOPS Monitoring and Evaluation (M&E) Framework for NHP Open-house Discussions The Presentation define about M & E framework to Help managers at all levels track results, implementation progress and agency performance and so make improvements and corrections. Show achievements and emerging issues to managers, decision makers and supervisors. Demonstrate the value of the project to politicians and the general public 2016/05/10 pptx Chris Wald
85 1354 WORKSHOPS Framework agreement The presentation highlights the core areas of equipment framework, how it will work and about the benefits after integration to bid document 2016/05/10 pptx Dr. Anish Bansal
86 1359 WORKSHOPS Project implementation strategy The presentation about project cabinet approval, project implementation strategy and financial management. 2016/05/09 ppt Dr. Amita Prasad, JS and Coordinator –NHP, MoWR
87 1357 WORKSHOPS Strategy for integrating IndiaWRIS and StateWRIS including data sharing mechanism The objective of the presentation, To collect available data from varied sources, generate new database, organize in standardized GIS format and provide scalable web-enabled information system. To provide easier and faster access for sharing of nationally consistent water resources data through a centralized database server. To provide tools to create value added maps by way of multi-layer stacking so as to provide integrated view to the water resources. To provide foundation for advanced modeling and future Spatial Decision Support Systems (SDSS) & automated data collection system. 2016/05/09 pdf Yogesh Paithankar
88 1358 WORKSHOPS Flood forecasting and Water Resources Modelling approach under NHP (Macro & Micro River Basin Modelling) Discussion on flood forecasting, consultancy by central water commission, macro & micro level modeling contribution by state. 2016/05/09 pptx CPMU, Manglik
89 1360 WORKSHOPS Current Status of Project and Way Forward, The presentation about Project Components, Preparation of Bid-documents,Project Timeline and current status of the project and way forward 2016/05/09 pdf Dr. Anju Gaur
90 1350 PROCUREMENT Example Bid Document for Surface Water Example Bid Document for Surface Water 2016/02/10 docx The World Bank
91 1351 PROCUREMENT Example Bid Document for Ground Water - DWLR Example Bid Document for Ground Water - DWLR shared by Uttar Pradesh 2016/02/10 docx
92 1630 PROCUREMENT Bidding Document for Procurement of Digital Water Level Recorders (DWLR) With Telemetry Example bid document for procurement of DWLR, an example from UP 2016/02/02 docx Team NHP
93 1349 TRAININGS Visit to The Netherlands: Key Learnings under National Hydrology Project The delegations, Purpose of the visit, water resources data and crises management center, flood modeling nodes, waste water treatment etc. 2015/12/02 ppt
94 1319 TRAININGS Acceptance Checklist Hydromet monitoring stations Acceptance Checklist, water level and discharge monitoring stations. 2015/11/16 docx Dr. Anish Hydro-Informatics Expert, The World Bank
95 1313 TRAININGS Module - Technical Specifications for RTDAS The module cover procurement of civil works, consultancy services, non consultancy services, goods (hydrological information system). Tender document for RTDAS 2015/11/15 pptx Dr. Anish Hydro-Informatics Expert, The World Bank
96 1320 TRAININGS Example Hydromet Bid Document Version Part 2 Hydromet bid example with reference to Supply, installation, testing, commissioning, training and maintenance of Automatic Barrage Operation of Durgapur Barrage, 2015/11/14 pdf Office of the Superintending Engineer
97 1321 TRAININGS Site Selection Guidelines This module covers hydrological monitoring stations, the purpose of the site, appropriateness for monitoring the parameter of interest, existing infrastructure, access, and security should be considered. 2015/11/14 docx Dr. Anish Hydro-Informatics Expert, The World Bank
98 1322 TRAININGS Example Bid Document from state of Tamilnadu This module covers standard bid document example form state of tamilnadu specifications, training components etc. 2015/11/14 docx Dr Anish Kumar, The world Bank
99 1325 TRAININGS PROCUREMENT- Civil Works Procurement thresholds, type of bidding document for works, features of bank modal, general requirements, bid security, price requirements etc. 2015/11/14 ppt Mr. Vedumurthy, World Bank
100 1326 TRAININGS Training Module for BIDDING DOCUMENTS - Procurement of Goods Objective, Procurement of goods, NCB, NCD Conditions, direct contracting, framework agreement, community based procurement, common issues in goods, ICB 2015/11/14 pptx Team NHP
101 1327 TRAININGS Preparation of Procurement Plan (PP) Need for procurement plan, Guidelines, Templates, format, Procurement cycle and categories. 2015/11/14 pptx Mr. Vedumurthy, World Bank
102 1314 TRAININGS Technical Specifications This module covers goods, services, warranty with operation and maintenance with technical specifications, maps & drawings and GIS locations of installations 2015/11/14 pptx Dr. Anish Hydro-Informatics Expert, The World Bank
103 1315 TRAININGS Hydrological Information System - Water Level measurements This module covers surface level water measurements in rivers/canals/reservoirs, water sensors, contract and non contract solutsions 2015/11/14 pptx
104 1328 TRAININGS Bank Procurement Guidelines General consideration, applicability of guidelines, conflict of interest, eligibility to offer goods and works, advance contracting and retroactive financing 2015/11/14 pptx
105 1316 TRAININGS Hydrological Information System - Integrated Reservoir Monitoring System This module covers about integrated reservoir water monitoring system, option for reservoirs, reservoir monitoring examples, criteria for selection and site example photographs 2015/11/14 pptx Dr. Anish Hydro-Informatics Expert, The World Bank
106 1317 TRAININGS Hydrological Information System - Telemetry Systems The module covers communication options, earth receiving stations, transmitter specifications, ERC specifications. Telemetry includes data logger to control room, INSAT VSAT GSm GPRS etc. 2015/11/14 pptx Dr. Anish Hydro-Informatics Expert, The World Bank
107 1318 TRAININGS Hydrological Information System - Discharge Measurement The module covers acoustic Doppler systems, ADVM general information, upward looking ADVM, Side looking ADVM, ADCP (current Profiler), discharge measurements, site selection, site problems etc. 2015/11/14 pptx Dr. Anish Hydro-Informatics Expert, The World Bank
108 1324 TRAININGS World Bank Procurement Procedures The module covers about bank Procurement, bank role in procurement, borrowers role, word bank procedure policies, legal documents governing bank operational procurement 2015/11/14 pptx Mr. Vedumurthy, World Bank
109 1348 TRAININGS Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations 2015/11/06 pdf
110 1295 WORKSHOPS River Basin Management in Southern Africa SADC Institutional Arrangements, Orasecom Plan and Lessons Learned, Southern African basins 2015/11/06 pptx
111 1296 WORKSHOPS Global Water Challenges - A River Basin Managers Perspective Update on Australian Water Reform,Observations on Current River Basin Challenges, Surface and Groundwater Irrigation—where is it going??? and Australian Water Partnership 2015/11/06 pdf Don Blackmore AM FTSE, (Chairman eWater –Chairman IWMI and former CE MDBC)
112 1300 TRAININGS Agenda for the Training Background, objective, dates, venue, resource persons, target group and contact details 2015/11/02 pdf Admin - IndiaWRM
113 1293 TRAININGS Summary Report on India National Groundwater Meeting: Scoping a National Reform Agenda Groundwater Governance and Management in India, Groundwater Reforms in Australia and NSW: An Overview, Hidden Treasure: Groundwater in India 2015/11/01 pdf
114 1292 WORKSHOPS National Hydrology Presentation for TAMC workshop 29th October 2015 2015/10/29 pptx
115 1309 TRAININGS List of Perticipants Total 51 number of participants has attended the workshop 2015/09/24 pdf Admin - IndiaWRM
116 1279 TRAININGS Space technology in MoWR India - WRIS, data information, management and dissemination. Setting up National Water Informative Center 2015/09/23 ppt
117 1280 TRAININGS hidden treasure - Ground Water in India India is the world largest user of ground water for agriculture, but within India context differ. Transformation impact, India borewell revolution. 2015/09/23 pptx
118 1281 TRAININGS Groundwater Reforms in Australia Groundwater Reforms in Australia and New South Wales New Delhi – September 2015 2015/09/23 pptx
119 1282 TRAININGS Current Groundwater Governance & Management in India Ground water scenario, challenges, current governance system, management initiatives and suggested Ground Water government reforms 2015/09/23 pptx
120 1278 TRAININGS Summary – Key messages Summary – Key messages, key reform elements and next steps 2015/09/23 pptx
121 1310 TRAININGS Agenda for India Groundwater Meeting: Scoping a National Reform Agenda Agenda for India Groundwater Meeting: Scoping a National Reform Agenda Ministry of Water Resources, River Development and Ganga Rejuvenation 2015/09/18 pdf Admin - IndiaWRM
122 1284 MISSIONS National Hydrology Project The Way Forward NHP - Learning from HP1 & HP2, Expected benefits & outcomes, Present status, Concerns of States, Silent features 2015/09/15 ppt Avanish Kant, CPMU
123 1285 MISSIONS WB Mission Wrap up meeting CWPRS PIP- brief National Hydrology Project (HP Phase 3) WB Mission 1-15, Sept., 2015 Project Implementation Plan (PIP) Revision Technical Session: Role and Responsibilities of Central Agencies , Central Water & Power Research Station 2015/09/15 pptx CWPRS
124 1286 MISSIONS Institutions for River Basin Management in Australia Bill Young Lead Water Resources Management Specialist World Bank, New Delhi 2015/09/15 pdf
125 1283 MISSIONS NHP -Mission 15th September 2015 Concepts of Hydrology Project, NHP Project Details, Fund Allocation Component Wise 2015/09/15 pptx
126 298 MISSIONS Presentation-Innovation in Lead Flood Forecast 2015/09/14 pptx
127 1273 MISSIONS Role of MOWR in NHP Achievements of HP1 and HP2. Role of MOWR in NHP, Expectations from States 2015/09/13 pdf
128 1270 MISSIONS National Hydrology Project – Where we stand NHP - Project background, Need for the Project, Expected benefits and outcomes 2015/09/13 ppt
129 1274 MISSIONS Role of CWC in NHP Activities Proposed to be carried out by CWC. Flash flood guidance coupled with weather forecast, Inundation modeling including cyclone related floods in delta regions 2015/09/13 pptx
130 1275 MISSIONS Role of CGWB in NHP e-Gems outlines, roles and responsibilities, ground water issues for consideration in NHP, Project objectives, Project success indicators, Proposed financial outlay, CGWB support to the states 2015/09/13 pptx
131 1276 MISSIONS Role of NIH in NHP Activities carried out during hydrology project phase 1 and 2. Project implementation plan of NIH, Proposed activities under NHP. Training and PDS. TOR for training, expert group. 2015/09/13 pptx
132 1277 MISSIONS Role of NRSC in NHP NRSC commitment to NHP, NRSC components, proposed activities under National Hydrology Project, development of country wide and web based hydro logical modelling system. 2015/09/13 pptx
133 1271 MISSIONS NHP Structure 2015/09/13 pptx
134 1272 MISSIONS IWRM in River Basin Water Resources Management – Challenges … and the use of models 2015/09/13 pdf
135 1756 MISSIONS World Bank Mission Under National Hydrology Project from 1st to 15th September, 2015 The Ministry of Water Resources , River development and Ganga Rejuvenation (MOWR, RD & GR) is coordinating the implementation of the hydrology projects with world bank assistance. The world bank mission is to finalize the project implementations plan, in respect of all the implementing agencies. 2015/08/26 pdf
136 269 TRAININGS Consultancy Service 2015/07/30 pdf
137 268 TRAININGS Presentation on Request for proposals - Selection of Consultants Presentation on request for proposals for Selection of Consultants 2015/07/29 pdf Mr. Arun
138 266 TRAININGS Civil Works 2015/07/28 pdf
139 267 TRAININGS Bid Evaluation -Procurement of Goods or Work 2015/07/28 pdf
140 263 TRAININGS General features of Public Procurement Basin Principles of Public Procurement 2015/07/27 pdf Arun Kumar Kolsur
141 261 TRAININGS Procurements under World Bank Funded Projects 2015/07/27 pdf
142 260 TRAININGS The World Bank Group, Governance Global Practice, Public Integrity and Openness Procurement Workshop 2015/07/27 pdf
143 264 TRAININGS PROCUREMENT GUIDELINES IMPORTANT ASPECTS Introduction, International competitive bidding, other methods of procurement, review by the bank, guidance to the bidders. 2015/07/27 pdf
144 265 TRAININGS PROCUREMENT NCB - CIVIL WORKS General requirements, National competitive bidding, instructions to the bidders, bid security, price adjustments etc. 2015/07/27 pdf
145 262 TRAININGS Procurement under World Bank funded Projects 2015/07/26 pdf
146 259 TRAININGS National Hydrology Project About National Hydrology Project and its components 2015/07/24 pdf Dr. D.S. Chaskar, Director NWA
147 249 TRAININGS Network Design 2015/06/24 ppt
148 250 TRAININGS ARG and Automatic Weather Stations 2015/06/24 pptx
149 251 TRAININGS Telemetry 2015/06/24 pptx
150 252 TRAININGS Integrated Reservoir Monitoring 2015/06/24 pptx
151 253 TRAININGS SCADA Systems 2015/06/24 pptx
152 255 TRAININGS Water Level Monitoring 2015/06/24 pptx
153 256 TRAININGS Discharge Measurement 2015/06/24 pptx
154 257 TRAININGS India WRIS 2015/06/24 pdf
155 258 TRAININGS Database Management – eSWIS 2015/06/24 pdf
156 1298 TRAININGS Agenda for the Training Background, objective, dates, venue , resource persons, target group and contact details 2015/06/19 pdf Admin - IndiaWRM
157 1294 TRAININGS Government Letter for Training on hydro-met network design under National Hydrology Project Government Letter for Training on hydro-met network design under National Hydrology Project at Himachal Pradesh institute of Public Administration (HIPA) 2015/06/04 pdf Avanish Kant
158 238 TRAININGS Module 16 - Site Selection, Datum, and Example Stattions Site Selection, Datum, and Example Stattions 2015/04/06 pptx
159 230 TRAININGS Module 11 - Essential Elements of a HIS Essential elements of hydrological information systems Module 15 2015/04/06 pptx
160 231 TRAININGS Module 12 - Overview of Hydrologic Monitoring Overview of hydrological monitoring 2015/04/06 pptx
161 232 TRAININGS Module 13 - Data Management Systems Development of hydrometeorological system , data management system for improved water management 2015/04/06 pptx
162 233 TRAININGS Module 14 - AWS and ARG Hydrological information system module automatic weather station and automatic rain guage 2015/04/06 pptx
163 234 TRAININGS Module 15 - Surface-Water Instrumentation Surface Water instrumentation 2015/04/06 pptx
164 235 TRAININGS Module 15 A - Intro to ADCPs Indroduction to accoustic doppler current profiler 2015/04/06 pptx
165 239 TRAININGS Module 20 - Integrated Reservoir Monitoring Hydrological information system module Integrated Reservoir monitoring system 2015/04/06 pptx
166 236 TRAININGS Module 17 - Water Quality Monitoring Overview of continuous water quality monitoring 2015/04/06 pptx
167 237 TRAININGS Module 18 -Telemetry Hydrological information system module telemetry systems 2015/04/06 pptx
168 223 TRAININGS Module - 2 WARIS_Presentation for Kolkata Generation of database and implementation of Web enabled water resources information system in the country 2015/04/06 ppt
169 224 TRAININGS Module 3 -Meteorological data collection network of IMD Meteorological data collection network of IMD 2015/04/06 pptx
170 225 TRAININGS Module - 5 Presentation on online surface water system (ISWis) Presentation on ISWIS - broad features based on web and desktop applications, data & functionality will be integrated, etc. 2015/04/06 pptx
171 226 TRAININGS Module 6 - Met Network Design Design of meteorological data networks, Hydro-Met Network Design Workshop, April 6-11, 2015 Kolkata 2015/04/06 ppt
172 227 TRAININGS Module 7 - Design of Key Rain gauge Network Raingauge network design, categories, methods, stages etc. 2015/04/06 ppt
173 228 TRAININGS Module 9 - Design of hydro-met station network Hydrometeorological network model of central water commission 2015/04/06 pptx
174 229 TRAININGS Module 10 - Continuous QW Data Continuous water quality monitoring 2015/04/06 pptx
175 1331 TRAININGS DATA NEEDS OF WATER SECTOR Module covers about hydrology requirement, availability of surface and ground water, planning design and development of water resources, long term hydrological for climate change studies 2015/04/03 ppt Dr. A.K. Lohani
176 1323 TRAININGS Sensor Specifications Version - 1 Macro enabled excel worksheet to generate hydromet sensor specifications. This sheet is useful to design standard bid document 2015/03/04 xlsm Dr. Anish Hydro-Informatics Expert, The World Bank
177 1291 PROCUREMENT Standard Bidding Document for Procurement of Goods under ICB Standard Bidding Document for Procurement of Goods under International Competitive Bidding (ICB), revision dated March 2013 2015/02/27 docx Team World Bank
178 1287 PROCUREMENT Standard Procurement Document for Selection of Consultants This Standard Request for Proposals (SRFP) has been prepared by the World Bank and is based on the Master Procurement Document for Selection of Consultants (Master Document). The Master Document was prepared by participating Multilateral Development Banks (MDBs) and reflects what are considered best practices. 2015/02/27 docx Team World Bank
179 1288 PROCUREMENT Standard Bidding Document for procurement of civil works under ICB user guide & Standard Bidding Document for procurement of civil works under ICB 2015/02/27 docx Team World Bank
180 127 PROCUREMENT Standard Bidding Document for Procurement of Very Small Civil Works under NCB (US $1 Million) Standard Bidding Document for Procurement of Very Small civil Works under National Competitive Bidding (US $1 Million) February 2015 2015/02/27 doc Team World Bank
181 270 WORKSHOPS Eflows in Water Policies, Plans and Projects 2015/02/05 ppt Rafik Hirji, World Bank
182 271 WORKSHOPS Eflow Assessment Experiences in Developing Countries 2015/02/04 pptx Jay O’Keeffe, South Africa
183 272 WORKSHOPS River Basin Planning & Eflow Assessment Experience in China 2015/02/04 pdf Robert Speed, Australia
184 273 WORKSHOPS Ganga River Basin – Hydrological Regime 2015/02/04 pptx Dr. Sandhya Rao, IIT Delhi, tbc
185 274 WORKSHOPS Ganga River Basin – Socio-Economic Values 2015/02/04 pdf Ritesh Kumar, Wetlands International
186 275 WORKSHOPS Ganga River Basin – An Ecosystem Services Perspective 2015/02/04 pptx Vinod Tare, IIT Kanpur
187 276 WORKSHOPS EU Water Framework Directive and Eflows 2015/02/04 pptx Mike Acreman, United Kingdom
188 277 WORKSHOPS Management of Environmental Water in the Murray-Darling 2015/02/04 pptx David Papps, Australia
189 279 WORKSHOPS Eflows Issues in Ganga Basin 2015/02/04 pptx N.N. Rai, Director, Hydrology, CWC
190 278 WORKSHOPS Past and ongoing Eflow Assessments 2015/02/04 ppt Suresh Babu, WWF
191 296 WORKSHOPS Presentation on Narmada Control Authority Presentation on Narmada Control Authority. It includes functions & objective of NCA inclusive sardar sarovar dam etc. 2015/02/02 pptx Shri Mukesh Chauhan
192 294 WORKSHOPS Presentation on Water resources of Maharashtra Presentation on Water resources of Maharashtra by Maharashtra Water Resources Regulatory Authority. It covers Objective of MWRRA, organisation chart, key functions, entitlement program on irrigation projects etc. 2015/02/02 ppt Dr. Suresh Kulkarni
193 1303 MISSIONS Presentation of Tamil Nadu WRIS Integrated GIS based web enabled data set for water stake holder department tamilnadu 2015/02/02 ppt Mr. S.S. Rajagopal, SWaRMA, TN
194 1301 MISSIONS Welcome and Achievement under Hydrology Project Hydrology Project a Journey, Flood disasters in Maharashtra, Reservoir operating system, real hydromet system 2015/02/02 pptx Shri Avanish Kant, MoWR, RD & GR
195 295 WORKSHOPS An Overview of integrated water resources management in Damodar Valley Corporation (DVC) Presentation on the Overview of integrated water resources management in Damodar Valley Corporation (DVC) 2015/02/02 pptx Shri Dipankar Chaudhary
196 280 WORKSHOPS Opportunities for Integrated Water Resources Management in India 2015/02/02 pptx Professor Y.K. Alagh (Former-Member, Planning Commission)
197 281 WORKSHOPS Murray Darling Basin Experience 2015/02/02 pptx Don Blackmore, Australia
198 293 WORKSHOPS Environmental Flows in an IWRM Context 2015/02/02 pptx Dr. Mike Acreman, CEH, UK
199 1304 MISSIONS Integrated Water Resources Management A framework for accessing water use sustainability in river basins, using data to make decisions, IWRM definitions, case study lemhi basin 2015/02/02 pdf Carter Borden, World Bank
200 1305 MISSIONS Ideal PIP cost-table PIP preparation for HP-3, tentative budget allocations, allocation for project components, unit cost rates and staff rates, Modal PIP from a medium to large state 2015/02/02 pptx Johan Grijsen, World Bank
201 1302 MISSIONS Status of HP-3 PIP & Way Forward Hydrology journey ahead, HP 3 project design, HP 3 vision, major issues and interventions, project components 2015/02/02 pptx Dr. Anju Gaur
202 297 WORKSHOPS Presentation on interstate water management Tungabhardra Board case study Presentation on interstate water management Tungabhardra Board case study. It includes genesis & history of project, roles and responsibilities of board, interstate water management and conflict management among states etc. 2015/02/02 ppt Dr. S K Srivastava
203 282 WORKSHOPS Integrating water quality management into river basin management 2015/02/02 pptx Fritz Holzwarth, Germany
204 283 WORKSHOPS IWRM Implementation and Capacity Development of River Basin Organization: Case of Brantas River Basin 2015/02/02 pptx Indonesia Pak Tjoek, Indonesia
205 284 WORKSHOPS Institutional Experiences in RBOs Across Asia 2015/02/02 ppt Dr Keizrul bin abdullah, Chairman NARBO
206 285 WORKSHOPS World Bank IWRM Initiatives in India 2015/02/02 pptx Dr. William Young, World Bank
207 286 WORKSHOPS ADB IWRM Projects (South & South East Asia) 2015/02/02 pptx Arnaud Cauchois and Clive Lyle, ADB
208 287 WORKSHOPS National IWRM Guidelines 2015/02/02 pptx Shri A B Pandya, Chairman, CWC
209 288 WORKSHOPS Proposed Institutional and Legislative Reforms with special emphasis on proposed River Basin Management Act 2015/02/02 pptx Shri M Gopalakrishnan
210 289 WORKSHOPS Institutional Context for IWRM and River Basin Planning in Vhina 2015/02/02 pptx Clive Lyle, Consultant, Asian Development Bank
211 290 WORKSHOPS Present/Future state of Water Data in India 2015/02/02 ppt Shri Yogesh Paithankar, Director CWC
212 291 WORKSHOPS Decision Support Systems for IWRM 2015/02/02 ppt Dr. R.P.Pande, NIH, Roorkee
213 292 WORKSHOPS Hydrological Modelling in India 2015/02/02 pptx Prof A.K. Gosain, IIT Delhi
214 1308 WORKSHOPS Agenda for National Workshop on Integrated Water Resources Management Detailed Agenda for National Workshop on Integrated Water Resources Management. 2015/01/23 pdf Admin - IndiaWRM
215 133 PROCUREMENT Standard Bid Document for Civil Works -National Competitive Bidding (Up to US $20 Million) Standard Bid Document for Civil Works -National Competitive Bidding (Up to US $20 Million) 2015/01/01 doc Team World Bank
216 218 TRAININGS Report on Internation Training Workshop Report on Internation Training Workshop on Surface geophysics for ground water at CSIR- National Geophysics Reearch Institute at Hyderabad 2014/11/03 pdf
217 219 TRAININGS Project Completion Report on International Training Workshop Project Completion Report on International Training Workshop on borehole geophysics for ground water by department of geology and geophysics, IIT Kharakpur 2014/11/03 pdf
218 1330 WORKSHOPS Meteosat Flow Forecasting and Drought Monitoring EARS Earth Environment Monitoring BV, Meteosat, energy and water balance monitoring system, rainfall processing 2014/09/17 ppt Mark de Weerd, MSc. EARS Earth Environment Monitoring BV Delft, The Netherlands
219 1332 TRAININGS Welcome note – Shri. Avanish Kant, Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India Objective of water resource management, vision of national water information center, 2014/09/10 pdf
220 1341 TRAININGS Ground Management Issues of Selected river basins with special reference to Hard Rock Aquifers,NIH Definition of hard rock, groundwater availability, surface ground water interaction, components of ground water management 2014/09/10 pdf
221 1346 TRAININGS ReSyP :A package for Reservoir System Analysis& DSS for water resources planning in India Silent features of NIH_ReSyP, analysis option, analysis ladder 2014/09/10 pdf SK Jain and MK Goel, NIH, India
222 1347 TRAININGS Decision Support System Planning DSS (P)for Integrated River Basin Planning & Management, All about decision support system 2014/09/10 pdf Dr. M.K. Goel, NIH
223 1340 TRAININGS Multiple tools for water resources management by NIH Himalayan water resources, Indus ganga brahputra basins, stream flow modelling, snow cover mapping from satellite data 2014/09/10 pdf Dr. Sanjay Jain,NIH
224 1334 TRAININGS Tools for Flood Management Tools for knowledge base, analysis and modeling, decision making and communication 2014/09/10 pdf Guna Paudyal Senior Flood Management Specialist Managing Director, DHI-(India)
225 1335 TRAININGS Weather analysis and forecasting in modern age An overview Numerical weather prediction, real time data and products from global NWP systems, porecast products 2014/09/10 pdf Dr. K Prasad (Rtd. DDGM, IMD) Weather Risk Ltd.
226 1337 TRAININGS Flood Management and irrigation system rehabilitation solutions in indian context Flood management, irrigation system rehabilitation solutions - pattamundai canal system in odisha 2014/09/10 pdf AECOM
227 1338 TRAININGS Meteosat Flow Forecasting and Drought Management EARS Earth Environment Monitoring BV, Energy and Water Balance Monitoring System , Meteosat, Energy en Water Balance 2014/09/10 pdf AndriesRosema, EARS, Netherlands
228 1339 TRAININGS Multiple tools and techniques for water resources management Modern Tools and Techniques for Water Resources Assessment and Management CSRIO overview, what we bring to water resources, supporting water resources management in south Asia, integrated water resources management 2014/09/10 pdf Geoff Podger
229 1342 TRAININGS Integrated Decision Support Tools for water resources management Integrated Decision Support Tools for water resources management 2014/09/10 pdf Jacob Host- Madsen, DHI, Denmark
230 1343 TRAININGS Flood Risk Management in Heavily Urbanized Floodplains Flood Risk Management in Heavily Urbanized Floodplains 2014/09/10 pdf Tuck Wai Lee & Mike Cope, CH2MHILL
231 1344 TRAININGS Practical Systems Modelling Approach for Effective IWRM Planning and Implementation Practical Systems Modelling Approach for Effective IWRM Planning and Implementation 2014/09/10 pdf Tuck Wai Lee, CH2MHILL
232 1345 TRAININGS Flood Risk Management in Heavily Urbanised Floodplains. Flood Risk Management in Heavily Urbanised Floodplains. 2014/09/10 pdf Bryan Harvey, MEng, MBA, MICE, CEng
233 1336 TRAININGS eWater Source Models are used in developing and monitoring water management policy 2014/09/10 pdf eWater
234 1333 TRAININGS Hydrology Project Phase – III Approach towards Integrated Water Resources Management Project Background, achievement under HP-1, silent features of HP-2,highlights of journey from HP1 to HP2. HIS, achievements under HP2, 2014/09/04 pdf Narendra Kumar, Commissioner (B&B)
235 1329 WORKSHOPS India Water Week 2015 Hydrology Project: Integrated Water Resources Management Hydrology Project journey ahead, HP3 Project Design and concept of hydrology 2014/09/04 pdf Dr. Anju Gaur Senior Water Resources Specialist The World Bank
236 131 PROCUREMENT Procurement Guidelines for Goods, works and Non Consulting Services Guidelines - Procurement of Goods, works and Non Consulting Services Under IBRD Loans and IDA credits and Grant by World Bank Borrowers. Revised July 2014 2011/01/01 pdf Team World Bank
237 132 PROCUREMENT Procurement Guidelines - Selection and Employement of Consultant Guidelines - Selection and Employment of Consultant, Under IBRD Loans and IDA credits and Grant by World Bank Borrowers.Revised July 2014 2011/01/01 pdf Team World bank

Tender Advertisement

SNO. Date & Time Event Detail Agency Web link
1 2016/12/14 EoI for Integrated Water Resources Management Studies in respect of three Indian River Basins (Krishna, Godavari, And Mahanadi) CWC View Doc
2 2016/11/19 Addendum to request for proposal for empenalment agreement for hydromet and water quality equipment CWC View Doc
3 2016/09/27 Advertisment of invitation for proposal (IFP) for empanelment of equipment supplier CWC View Doc
4 2016/05/17 Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP MOWR View Doc
5 2016/05/17 Newspaper advertisement for Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP MOWR View Doc

Training

SNO. Date & Time Training Detail Agency Web link
1 2016/12/30 Advanced Training on Basin Planning and modelling using Riverware software at Ahmedabad 30-Jan 2017 to 3 Feb 2017 Gujarat (SW) View Doc
2 2016/12/20 Training Program on HEC Modelling software at Roorkee Rescheduled from "6-11 Feb 2017" to 20-25 Feb, 2017 MOWR View Doc
3 2016/12/05 Final List of Participants regarding Training Program on World Bank New Procurement Tracking System - STEP at New Delhi MOWR View Doc
4 2016/11/30 Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences from 19th December 2016 to 27th January 2017 by NWA CWC View Doc
5 2016/10/27 Schedule - International Seminar on Reliable Data Acquisition system for integrated water resources Management CWPRS View Doc
6 2016/10/26 Training on River Basin Planning using Waterware Software from 14th to 18th Nov, 2016 at Kolkata under NHP DVC View Doc
7 2016/10/25 Three Training Programs on World Bank Procurement application (STEP) by Procurement Experts from World Bank during November 2016 at Delhi, Chennai, Kolkata WB View Doc
8 2016/10/06 Delft3D webinar - Morphological model of the River Rhine branches from the concept to the operational model WB View Doc
9 2016/09/02 Training Program on World Bank Procurement Procedures by Procurement Experts from World Bank during September 26-27, 2016 at Shillong, Meghalaya. MOWR View Doc
10 2016/09/01 Three Training Courses to be organised by NIH in the month of September & October regarding Basic Hydrology, Surface Water Modelling, Ground Water and Transport Modelling. NIH View Doc
11 2016/08/23 Postponed: International Seminar On National Hydrology Project: Towards a Reliable Data Acquisition for IWRM 29 Sept – 1 Oct 2016 Pune, India CWPRS View Doc
12 2016/08/16 Training on River Basin modelling using HEC - RAS software under NHP, Department of Hydrology, IIT Roorkee from 5th to 10th September MOWR View Doc
13 2016/06/29 Training Course on Ground Water and Transport Modelling during Sept 26-30, 2016 at NIH Regional Centre, Kakinada NIH View Doc
14 2016/05/30 Course on River Basin Planning using HEC software from 11th to 15th July, 2016 MOWR View Doc
15 2016/05/02 Course on River Basin Planning using HEC Software from 16th to 20th May 2016 at IIT - Roorkee MOWR View Doc
16 2016/02/23 Link to NASA Online Flood Management Training WB View Doc
17 2016/02/03 Training of Trainers on Hydrometeorological and WQ instruments under National Hydrology Project MOWR View Doc
18 2016/01/22 Workshop on stakeholders involvement and participation is being organized at Hotel Shangri - La, Janpath, New Delhi on Friday 29th January WB View Doc
19 2016/01/15 Invitation for "Integrated Water Management for Irrigation Networks and Flood Management- International Best Practices" 21-22 January, 2016 WB View Doc
20 2015/10/28 Training on World Bank Procurement Procedure at Guwahati from 16-18 Nov. 2015. WB View Doc
21 2015/09/28 Workshop on India Ground Water - Scoping a National Reform Agenda WB View Doc
22 2015/06/05 Training on WB procurement procedures at NWA from 27th to 31st July 2015 WB View Doc
23 2015/06/05 Training on Hydro-met network design at Shimla from 29th June to 3rd July 2015 WB View Doc
24 2015/05/30 Training Program - Introduction to HEC based modelling Solution WB View Doc
25 2015/03/20 Training on Hydromet system in April 6-11 (Register Closed) WB View Doc

Input Awaited

SNO. Date & Time Detail Agency Web link
1 2016/12/13 Template for location of Hydromet Stations under NHP MOWR View Doc
2 2016/10/17 Template for assessment of E - procurement system WB View Doc
3 2016/09/06 Telemetry hydro-met stations for result frame work including baseline and project end target WB View Doc
4 2016/08/22 Template for bench-marking of Water Data Centers and the Water Institution WB View Doc
5 2016/08/22 Basin-state matrix for major activities under project WB View Doc